Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Oct 2025 |
| Application filed | 20 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Goura Associates |
| Land area | 8.1 acres (3.3 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Srungavaram |
| Taluk / tehsil | Nathavaram |
| District | Anakapalli |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-02597 |
In context
213 applications in Anakapalli since January 2022 are in the same category (Mining): 151 approved, 18 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8.1 acres, this one is smaller than 52% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 13 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.
Where it is
Srungavaram, Nathavaram, Anakapalli, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Semi Mechanized Opencast Mining Method for Colour Granite Over an Extent of… — environmental approval granted, 0 m away
- Colour Granite over an extent of 3.27 Ha - M/s. Goura Associates - Survey No.… — lapsed, 0 m away
- Semi Mechanized Opencast Mining Method for Colour Granite Over an Extent of… — environmental approval granted, 450 m away
- Colour Granite over an extent of 1.0 Ha - M/s. Goura Associates - Survey No.… — lapsed, 450 m away
- Sri Naga Jogi Varma Thotakura_1.536 Ha (Road Metal & Building Stone) — more information requested, 5 km away
- Mining project by M/s. Sri Balaji Stone Crushers — cleared for impact study, 5 km away
- Mining project by M/s Sri Sanari Black Stone Crusher — environmental approval granted, 5.1 km away
- Proposed Road Metal & Building Stone Project of Sri K. Krishna — cleared for impact study, 7.2 km away
More from Goura Associates in Anakapalli
- Semi Mechanized Opencast Mining Method for Colour Granite Over an Extent of… — environmental approval granted
- Semi Mechanized Opencast Mining Method for Colour Granite Over an Extent of… — environmental approval granted
- Colour Granite over an extent of 3.27 Ha - M/s. Goura Associates - Survey No.… — lapsed
- Colour Granite over an extent of 1.0 Ha - M/s. Goura Associates - Survey No.… — lapsed
5 Goura Associates projects in Anakapalli
All 6 Goura Associates projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.