Quick answers
What is Mining project by M/s. Yashco Solutions Pvt. Ltd.,?
This approved mining project by M/s. Yashco Solutions Pvt. Ltd., is in Naruva, Ranastalam, Srikakulam, Andhra Pradesh. The site covers 7.4 acres.
Who is building it?
The applicant is Yashco Solutions Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Jan 2026), as of 27 Nov 2026.
Where is it?
In Naruva, Ranastalam, Srikakulam, Andhra Pradesh.
How big is it?
It has a stated cost of ₹30 lakh and a site of 7.4 acres.
When was it filed?
The application was filed on 18 Oct 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Jan 2026 |
| Application filed | 18 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Yashco Solutions Private Limited |
| Land area | 7.4 acres (3 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Naruva |
| Taluk / tehsil | Ranastalam |
| District | Srikakulam |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-02769 |
In context
286 applications in Srikakulam since January 2022 are in the same category (Mining): 209 approved, 37 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.4 acres, this one is smaller than 74% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Naruva, Ranastalam, Srikakulam, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s GK Infra - 1.00 Hectares — environmental approval granted, 750 m away
- Sri Gundu Kailasha Rao — environmental approval granted, 950 m away
- Active Pharma Ingredients (Bulk Drug and Intermediates) Manufacturing Unit by… — coastal clearance granted, 1.6 km away
- Marine Environmental Impact Assessment Study for amendment of CRZ clearance to… — coastal clearance granted, 3.1 km away
- Agrochemicals, Synthetic Organic chemicals, Fluorine based chemicals… — environmental approval granted, 3.5 km away
- Greenfield steel plant comprising of 3 x 9 MVA Submerged Electric Arc Furnaces… — environmental approval granted, 3.5 km away
- Project by M/s. Aparna Pharmaceuticals Private Limited — initial checks, 3.9 km away
- Project by M/s. Aparna Pharmaceuticals Private Limited — initial checks, 3.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.