Cleared for impact studyIndustry · Anantpur, Andhra Pradesh

Greenfield steel plant comprising of I/O Beneficiation Plant (0.4 MTPA), Pellet Plant (0.33 MTPA), Gasifier for Pellet plant (2x7,500 Nm3/hr), DRI Kilns (Sponge Iron - 2,31,000 TPA), Induction Furnaces (MS Billets/Ingots- 2,64,000 TPA ), Rolling Mill (TMT bars / Structural Steel / Other Rolled Products – 2,64,000 TPA (85% Hot charging with Hot Billets and remaining 15% through RHF with LDO as fuel/Pulverized coal), Gasifier for Rolling Mill and RHF (1x7,000 Nm3/hr), Submerged E

Greenfield steel plant comprising of I/O Beneficiation Plant (0.4 MTPA), Pellet Plant (0.33 MTPA), Gasifier for Pellet plant (2x7,500 Nm3/hr), DRI Kilns (Sponge Iron - 2,31,000 TPA), Induction Furnaces (MS Billets/Ingots- 2,64,000 TPA ), Rolling Mill (TMT bars / Structural Steel / Other Rolled Products – 2,64,000 TPA (85% Hot charging with Hot Billets and remaining 15% through RHF with LDO as fuel/Pulverized coal), Gasifier for Rolling Mill and RHF (1x7,000 Nm3/hr), Submerged E is a proposed industrial project in Hiradahalu, D.Hirehal, Anantpur, Andhra Pradesh. The site covers 334.5 acres. Its stated project cost is ₹560 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 19 Jan 2025).

See it on the live map All projects in Anantpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleEstablishment of Greenfield steel plant comprising of I/O Beneficiation Plant (0.4 MTPA), Pellet Plant (0.33 MTPA), Gasifier for Pellet plant (2x7,500 Nm3/hr), DRI Kilns (Sponge Iron - 2,31,000 TPA), Induction Furnaces (MS Billets/Ingots- 2,64,000 TPA ), Rolling Mill (TMT bars / Structural Steel / Other Rolled Products – 2,64,000 TPA (85% Hot charging with Hot Billets and remaining 15% through RHF with LDO as fuel/Pulverized coal), Gasifier for Rolling Mill and RHF (1x7,000 Nm3/hr), Submerged E
StatusCleared for impact study
Status since19 Jan 2025
Application filed16 Jan 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantDhanlaxmi Iron Industries Private Limited
Land area334.5 acres (135.4 ha)
Project cost₹560 crore
Village / localityHiradahalu
Taluk / tehsilD.Hirehal
DistrictAnantpur
StateAndhra Pradesh
Location fromSite boundary on record
Our referenceWID-AP-03021

In context

18 applications in Anantpur since January 2022 are in the same category (Industry): 11 approved, 3 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 334.5 acres, this one is larger than 56% of them.

Where it is

Hiradahalu, D.Hirehal, Anantpur, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Dhanlaxmi Iron Industries Private Limited in Anantpur