Project details
| Status | Lapsed |
|---|---|
| Status since | 2 Aug 2025 |
| Application filed | 22 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Kutalagari Nagamma |
| Land area | 1,600 m² |
| Project cost | ₹8 lakh |
| Village / locality | Pulapatturu |
| Taluk / tehsil | Rajampet |
| District | Annamayya |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-03061 |
In context
153 applications in Annamayya since January 2022 are in the same category (Mining): 128 approved, 11 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.4 acres, this one is smaller than 100% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Pulapatturu, Rajampet, Annamayya, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Smt. K. Nagamma — environmental approval granted, 0 m away
- Paturu Sand Reach - 12.60 HA — cleared for impact study, 8 km away
- Mining project by M/s S.L.V Mines and Minerals — under environmental review, 12.6 km away
- Mining project by M/s S.L.V Mines and Minerals — cleared for impact study, 12.6 km away
- Mining project by M/s Sowmyanatha Swamy Mines — environmental approval granted, 12.7 km away
- Clay Quarry Over an Extent of 9.623 Ha — environmental approval granted, 12.8 km away
- Adapur Sand Reach — environmental approval granted, 13.7 km away
- Gadikota Pumped Storage Project (1200 MW) — cleared for impact study, 13.9 km away
More from Kutalagari Nagamma in Annamayya
- Smt. K. Nagamma — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.