Quick answers
What is this project?
This approved mining project by M/s. P.V.R. Chalapathi Metal Industries – 1.568 Ha is in Perecherla, Medikonduru, Guntur, Andhra Pradesh. The site covers 3.9 acres.
Who is building it?
The applicant is Pilla Venkateswararao.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 15 Apr 2025), as of 27 Nov 2026.
Where is it?
In Perecherla, Medikonduru, Guntur, Andhra Pradesh.
How big is it?
It has a stated cost of ₹20 lakh and a site of 3.9 acres.
When was it filed?
The application was filed on 18 Feb 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 15 Apr 2025 |
| Application filed | 18 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pilla Venkateswararao |
| Land area | 3.9 acres (1.6 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Perecherla |
| Taluk / tehsil | Medikonduru |
| District | Guntur |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-03148 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Validity extension filed 2 Oct 2026 | More information requested | 3.9 acres | ₹20 lakh |
| New project filed 18 Feb 2025 (this page) | Environmental approval granted | 3.9 acres | ₹20 lakh |
In context
164 applications in Guntur since January 2022 are in the same category (Mining): 104 approved, 16 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.9 acres, this one is larger than 53% of them.
27 other mining leases have applied within 500 m of this site; together with this one they cover 108.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 77 mining leases have applied within 5 km.
Where it is
Perecherla, Medikonduru, Guntur, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s. P.V.R. Chalapathi Metal Industries – 1.568 Ha — more information requested, 0 m away
- Mining project by M/s. The Hanuman Nagar Vaddera Labour Contract Co-Operative… — environmental approval granted, 100 m away
- Mining project by M/s. Sri Gayatri Stone Crusher – 1.568 Ha — more information requested, 100 m away
- Mining project by M/s. Sri Gayatri Stone Crusher – 1.568 Ha — environmental approval granted, 100 m away
- P V R Chalapathi Metal Industries - 1.00 Ha — lapsed, 100 m away
- P V R Chalapathi Metal Industries - 1.00 Ha — environmental approval granted, 100 m away
- Smt. S.Adilakshmi - 0.421 Ha. — lapsed, 150 m away
- Smt. S.Adilakshmi - 0.421 Ha. — environmental approval granted, 150 m away
More from Pilla Venkateswararao in Guntur
- Mining project by M/s. Sri Gayatri Stone Crusher – 1.568 Ha — more information requested
- Mining project by M/s. P.V.R. Chalapathi Metal Industries – 1.214 Ha — lapsed
- Venkateswra Stone Industries - 1.00 Ha — lapsed
- P V R Chalapathi Metal Industries - 1.00 Ha — lapsed
- Mining project by M/s. PVR Chalapathi Metal Industries- 4.484 HA — more information requested
- PVR Chalapathi Metal Industries - 1.186 Ha — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.