Project details
| Status | Lapsed |
|---|---|
| Status since | 11 Jun 2025 |
| Application filed | 27 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Neelakanteswara Constructions |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Chiyyedu |
| Taluk / tehsil | Anantapur |
| District | Anantpur |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-03182 |
In context
223 applications in Anantpur since January 2022 are in the same category (Mining): 158 approved, 23 filed or under review, and 42 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9.9 acres, this one is larger than 55% of them.
No other mining lease on record is within 500 m of this site; 19 have applied within 5 km.
Where it is
Chiyyedu, Anantapur, Anantpur, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Smt. M. Gayathri — cleared for impact study, 2.1 km away
- Smt. M. Gayathri — environmental approval granted, 2.1 km away
- Sri. M. Gnaneswar-0.760 Ha — cleared for impact study, 2.1 km away
- Sri. M. Gnaneswar-0.760 Ha — environmental approval granted, 2.1 km away
- Smt. M. Vakula Devi — cleared for impact study, 2.2 km away
- Smt.Vakuladevi Mining of Road Metal and Building Stone (Violation) — cleared for impact study, 2.2 km away
- M/s. Srinivasa Stone Crushers, Quarry lease for Road Metal & Building Stone,… — environmental approval granted, 2.3 km away
- Mining of Road Metal and Building Stone over an extent of 2.0 Ha held by M/S… — environmental approval granted, 2.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.