Quick answers
What is Mining project by M/s Sri Surya Infra?
This withdrawn mining project by M/s Sri Surya Infra is in Pathivada, Pusapatirega, Vizianagaram, Andhra Pradesh. The site covers 11.1 acres.
Who is building it?
The applicant is Sri Suriya Infra.
Has it been approved?
No. The application was withdrawn on 4 Nov 2025, so it is no longer under consideration.
Where is it?
In Pathivada, Pusapatirega, Vizianagaram, Andhra Pradesh.
How big is it?
It has a stated cost of ₹50 lakh and a site of 11.1 acres.
When was it filed?
The application was filed on 4 Nov 2025.
Project details
| Status | Withdrawn |
|---|---|
| Status since | 4 Nov 2025 |
| Application filed | 4 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sri Suriya Infra |
| Land area | 11.1 acres (4.5 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Pathivada |
| Taluk / tehsil | Pusapatirega |
| District | Vizianagaram |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-03261 |
In context
183 applications in Vizianagaram since January 2022 are in the same category (Mining): 141 approved, 6 filed or under review, and 36 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 11.1 acres, this one is larger than 58% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Pathivada, Pusapatirega, Vizianagaram, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s Sri Suriya Infra — environmental approval granted, 0 m away
- Sri. Chalasani Srikanth — environmental approval granted, 1.8 km away
- Sri. Chalasani Srikanth — lapsed, 1.8 km away
- Wellness Centre and Rythu Barosa Kendram Buildings at Tippalavalasa — lapsed, 3.8 km away
- Environmental Impact Assessment for Manufacturing of Paper Sizing Chemical… — lapsed, 4.3 km away
- The proposed project involves the establishment of a 3.0 MLD Combined Effluent… — more information requested, 4.9 km away
- Proposed to establish 3.0 MLD Common Effluent Treatment Plant (CETP) by… — cleared for impact study, 4.9 km away
- Proposed to establish 3.0 MLD Common Effluent Treatment Plant (CETP) by… — cleared for impact study, 4.9 km away
More from Sri Suriya Infra in Vizianagaram
- Mining project by M/s Sri Suriya Infra — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.