Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Nov 2025 |
| Application filed | 6 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Maruti Constructions |
| Land area | 8.1 acres (3.3 ha) |
| Project cost | ₹55 lakh |
| Village / locality | Paritala |
| Taluk / tehsil | Kanchikacherla |
| District | Ntr |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-03276 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Apr 2025 (this page) | Environmental approval granted | 8.1 acres | ₹55 lakh |
| Early planning filed 25 Aug 2023 | Cleared for impact study | 8.1 acres | ₹55 lakh |
In context
243 applications in Ntr since January 2022 are in the same category (Mining): 182 approved, 31 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8.1 acres, this one is smaller than 59% of them.
10 other mining leases have applied within 500 m of this site; together with this one they cover 99.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 67 mining leases have applied within 5 km.
Where it is
Paritala, Kanchikacherla, Ntr, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 3.280 Ha. of Road Metal Mine of M/s. Maruthi Constructions, Sy. No.801,… — cleared for impact study, 50 m away
- Mining project by M/s Sri Srinivasa Stone Crusher — cleared for impact study, 150 m away
- Sri K. Srinivasa Rao — environmental approval granted, 200 m away
- 4.056 hectares of Road Metal, Ballast, Rough Stone, & Boulders, Manufactured… — lapsed, 250 m away
- Mining project by M/s Elite Marketing, Mg. Pt: K. Lakshmi Bandhavi (7.830 Ha) — lapsed, 300 m away
- Mining project by M/s. Srinivasa Edifice Private Limited – 2.500 Ha — lapsed, 300 m away
- Sri N. Uma Maheswara Rao — environmental approval granted, 300 m away
- Mining project by M/s Maruti Constructions — under environmental review, 350 m away
More from Maruti Constructions in Ntr
- Mining project by M/s Maruti Constructions — under environmental review
All 3 Maruti Constructions projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.