One of 3 filings for this project. The project's main page, with every filing and where each stands: Mining project by M/s Sriraja Projects
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 29 Oct 2025 |
| Application filed | 17 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Mining |
| Applicant | Sri Raja Projects |
| Land area | 6.7 acres (2.7 ha) |
| Project cost | ₹1.2 crore |
| Village / locality | Maruturu |
| Taluk / tehsil | Anakapalle |
| District | Anakapalli |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-03404 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 6 May 2026 | Environmental approval granted | 14.9 acres | ₹1.6 crore |
| Expansion filed 17 Sept 2025 (this page) | Environmental approval granted | 6.7 acres | ₹1.2 crore |
| Early planning filed 27 Nov 2024 | Cleared for impact study | 14.9 acres | ₹1.6 crore |
In context
213 applications in Anakapalli since January 2022 are in the same category (Mining): 151 approved, 18 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 6.7 acres, this one is smaller than 61% of them.
8 other mining leases have applied within 500 m of this site; together with this one they cover 103.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 48 mining leases have applied within 5 km.
Where it is
Maruturu, Anakapalle, Anakapalli, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s. SGX Minerals Private Limited — cleared for impact study, 150 m away
- Mining project by M/s. Lakshmi Ganapathi Mineral — environmental approval granted, 150 m away
- Mining project by M/s Rank Silicon and Industries Private Limited, Mg.Dir.:… — environmental approval granted, 250 m away
- M/s Rank Silicon & Industries Pvt Ltd , Road Metal ,Building Stone and Gravel… — environmental approval granted, 250 m away
- Mining project by M/s. SGX Minerals Private Limited — cleared for impact study, 250 m away
- Mining project by M/s Ravitej Projects Private Limited, Mg.D: Sri J. Srinivas — environmental approval granted, 250 m away
- Smt Tamatapu Vijaya Kumari — lapsed, 350 m away
- Smt Tamatapu Vijaya Kumari — withdrawn, 350 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.