Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 29 Dec 2025 |
| Application filed | 13 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Royalty Inspector DMGO Kadapa |
| Land area | 9 acres (3.6 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Sambaturu |
| Taluk / tehsil | Kamalapuram |
| District | Y.S.R. |
| State | Andhra Pradesh |
| Location from | Site area on record |
| Our reference | WID-AP-03439 |
In context
139 applications in Y.S.R. since January 2022 are in the same category (Mining): 106 approved, 8 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9 acres, this one is smaller than 76% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Sambaturu, Kamalapuram, Y.S.R., Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Vibhurapuram Sand Reach — environmental approval granted, 1.3 km away
- Major Bridge Across Papagni River Including Approaches at Km 153/200 of… — forest land use approved, 7.3 km away
- Major Bridge across Papagni River at Km 153/200 of NH-716 in the State of… — lapsed, 7.6 km away
- Major Bridge across Papagni River at Km 153/200 of NH-716 in the State of… — lapsed, 7.6 km away
- Mining project by M/s Bharathi Cement Corporation Private Limited — cleared for impact study, 8.2 km away
- Thippalur Limestone mine ( ML area 17.688 ha and 0.2 MTPA of Limestone… — lapsed, 9.4 km away
- Thippalur Limestone mine ( ML area 17.688 ha and 0.2 MTPA of Limestone… — not approved, 9.4 km away
- Chinnaputha Sand Reach — environmental approval granted, 10.7 km away
More from Royalty Inspector DMGO Kadapa in Y.S.R.
- Venkayyakalva Sand Reach - 20 Ha — cleared for impact study
- Marellamadaka-II Open Sand Reach — environmental approval granted
- Kondavandlapalli Open Sand Reach — cleared for impact study
- Goriganur Sand Reach — environmental approval granted
- Goriganur Sand Reach — environmental approval granted
- Goriganuru & Kanneluru Sand Reach — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.