Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 25 Apr 2026 |
| Application filed | 6 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Sri Sringeri Sarada Granites |
| Land area | 5.7 acres (2.3 ha) |
| Project cost | ₹45 lakh |
| Village / locality | Edavalli |
| Taluk / tehsil | Chilakaluripet H/O.Purushotha* |
| District | Palnadu |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-03545 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 7 Nov 2026 | Under environmental review | 5.7 acres | ₹45 lakh |
| Early planning filed 6 Mar 2026 (this page) | Cleared for impact study | 5.7 acres | ₹45 lakh |
In context
178 applications in Palnadu since January 2022 are in the same category (Mining): 124 approved, 15 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.7 acres, this one is smaller than 53% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 20.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 18 mining leases have applied within 5 km.
Where it is
Edavalli, Chilakaluripet H/O.Purushotha*, Palnadu, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 2.323 Ha Black Granite, Road Metal/Building Stone & Gravel Quarry of M/s Sri… — under environmental review, 0 m away
- M/S Om Sri Enterprises, Mg.Partner: Sri S. Bharath Kumar Quarry lease for… — environmental approval granted, 350 m away
- Mining project by M/s. Kishore Slabs and Tiles — cleared for impact study, 500 m away
- Mining project by M/s Venkata Manjunadha Granites — environmental approval granted, 600 m away
- Mining project by M/s Kishore Slabs & Tiles — environmental approval granted, 700 m away
- Mining project by M/s. SRI VISHNU GRANITES — environmental approval granted, 850 m away
- Mining project by M/s Madhucon Granites Limited — lapsed, 900 m away
- Mining project by M/s Sri Vahin Granites — environmental approval granted, 900 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.