Quick answers
What is this project?
Empowering Oncology Nursing through Skilling & Supportive Infrastructure by M/s Sri Venkateswara Institute of Cancer Care & Advanced Research (SVICCAR) (A Unit of Tata Cancer Care Foundation) is an approved hospital project in Tirupati, Tirupati (Urban), Andhra Pradesh. The site covers 25 acres.
Who is building it?
The applicant is Tata Cancer Care Foundation.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Jun 2026), as of 27 Nov 2026.
Where is it?
In Tirupati, Tirupati (Urban), Andhra Pradesh.
How big is it?
It has a stated cost of ₹66.2 crore and a site of 25 acres.
When was it filed?
The application was filed on 29 Apr 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Empowering Oncology Nursing through Skilling & Supportive Infrastructure by M/s Sri…
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Jun 2026 |
| Application filed | 29 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Tata Cancer Care Foundation |
| Use | Hospital |
| Land area | 25 acres (10.1 ha) |
| Project cost | ₹66.2 crore |
| Village / locality | Tirupati |
| Taluk / tehsil | Tirupati (Urban) |
| District | Tirupati |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-03585 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 12 Sept 2026 | Environmental approval granted | 25 acres | ₹89.6 crore |
| New project filed 29 Apr 2026 (this page) | Environmental approval granted | 25 acres | ₹66.2 crore |
In context
25 applications in Tirupati since January 2022 are in the same category (Buildings & townships): 15 approved, 10 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 25 acres, this one is smaller than 56% of them.
Where it is
Tirupati, Tirupati (Urban), Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Empowering Oncology Nursing through Skilling & Supportive Infrastructure by… — environmental approval granted, 0 m away
- IBIS Styles & Novotel Hotel At Tirupati by M/s. Shravanthi Hotels and Resorts… — more information requested, 5.9 km away
- Sri M. Yella Reddy, Over An Extent of 5.000 Ha, EC Amendment — environmental approval granted, 7.1 km away
- Quarry lease of Sri M Yella reddy over an extent of 5.00 Ha, Mining of Road… — not approved, 7.1 km away
- Proposed Road Metal, Building Stone and Gravel of Sri Yella Reddy Over an… — environmental approval granted, 7.2 km away
- Construction of Residential High rise Building by M/s. Sumanth Homes — environmental approval granted, 7.5 km away
- Mining project by M/s.Sri.Balaji Stone Crusher Prop: Sri.V.Meghanatha… — lapsed, 7.6 km away
- Mining project by M/s.Sri.Balaji Stone Crusher Prop: Sri.V.Meghanatha… — lapsed, 7.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.