Quick answers
What is Mining project by M/s AVR Stone Crushers-4.601 Hectares?
This proposed mining project by M/s AVR Stone Crushers-4.601 Hectares is in Kurucherlapadu, Venkatachalam, Nellore, Andhra Pradesh. The site covers 11.4 acres.
Who is building it?
The applicant is Pamula Ramanaiah.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kurucherlapadu, Venkatachalam, Nellore, Andhra Pradesh.
How big is it?
It has a stated cost of ₹46 lakh and a site of 11.4 acres.
When was it filed?
The application was filed on 15 Jul 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 8 Sept 2026 |
| Application filed | 15 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pamula Ramanaiah |
| Land area | 11.4 acres (4.6 ha) |
| Project cost | ₹46 lakh |
| Village / locality | Kurucherlapadu |
| Taluk / tehsil | Venkatachalam |
| District | Sri Potti Sriramulu Nellore (Nellore) |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-03602 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 Jul 2026 | Lapsed | 11.4 acres | ₹46 lakh |
| New project filed 15 Jul 2026 (this page) | More information requested | 11.4 acres | ₹46 lakh |
In context
232 applications in Nellore since January 2022 are in the same category (Mining): 150 approved, 25 filed or under review, and 57 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 11.4 acres, this one is smaller than 62% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Kurucherlapadu, Venkatachalam, Nellore, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s AVR Stone Crushers-4.601 Hectares — lapsed, 0 m away
- Preliminary Exploration for Feldspar, Mica, Quartz & Quartzite over and extent… — lapsed, 4.7 km away
- Preliminary Exploration Over an Extent of 4.61 Ha of Forest Land in Kasumur — lapsed, 4.7 km away
- Various Buildings, Including Bulk Services and Development Works in the Campus… — environmental approval granted, 5.2 km away
- Mining project by M/s Sri Karthikeya MSand LLP — environmental approval granted, 6.1 km away
- Mining project by M/s Sri Karthikeya MSAND LLP — under environmental review, 6.2 km away
- 3.800 Ha. of Road Metal Quarry of M/s Sri Lakshmi Srinivasa Mining, Survey No.… — environmental approval granted, 6.2 km away
- Diversion of 3.80 Ha. (Previously 3.20 Ha.) of forest land for quarrying of… — under forest review, 6.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.