What is Developing? Open the mapMap

Initial checksIndustry · Vizianagaram, Andhra Pradesh

Enhancement of Billets/Blooms production and Structural steel/TMT bars production Under "NO INCREASE IN POLLUTION LOAD"

Enhancement of Billets/Blooms production and Structural steel/TMT bars production Under "NO INCREASE IN POLLUTION LOAD" is a proposed industrial project in Sriramapuram, Lakkavarapukota, Vizianagaram, Andhra Pradesh. The site covers 200 acres. Its stated project cost is ₹328.3 crore. As of 27 Nov 2026, its status is “Initial checks” (since 3 Jul 2026).

See it on the live map All projects in Vizianagaram

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Enhancement of Billets/Blooms production and Structural steel/TMT bars production Under "NO INCREASE IN POLLUTION LOAD" is a proposed industrial project in Sriramapuram, Lakkavarapukota, Vizianagaram, Andhra Pradesh. The site covers 200 acres.

Who is building it?

The applicant is Steel Exchange India Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Sriramapuram, Lakkavarapukota, Vizianagaram, Andhra Pradesh.

How big is it?

It has a stated cost of ₹328.3 crore and a site of 200 acres.

When was it filed?

The application was filed on 3 Jul 2026.

Project details

StatusInitial checks
Status since3 Jul 2026
Application filed3 Jul 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantSteel Exchange India Limited
Land area200 acres (80.9 ha)
Project cost₹328.3 crore
Village / localitySriramapuram
Taluk / tehsilLakkavarapukota
DistrictVizianagaram
StateAndhra Pradesh
Location fromSite boundary on record
Our referenceWID-AP-03799

In context

40 applications in Vizianagaram since January 2022 are in the same category (Industry): 25 approved, 10 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 200 acres, this one is larger than 88% of them.

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sriramapuram, Lakkavarapukota, Vizianagaram, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Steel Exchange India Limited in Vizianagaram

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.