Quick answers
What is Building project by N. A. N. Silox Greenmet Private Limited?
This proposed building project by N. A. N. Silox Greenmet Private Limited is in Palepolam, Naidupet, Tirupati, Andhra Pradesh. The site covers 21.3 acres.
Who is building it?
The applicant is N. A. N. Silox Greenmet Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Palepolam, Naidupet, Tirupati, Andhra Pradesh.
How big is it?
It has a stated cost of ₹13.7 crore and a site of 21.3 acres.
When was it filed?
The application was filed on 4 Sept 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 23 Oct 2026 |
| Application filed | 4 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | N. A. N. Silox Greenmet Private Limited |
| Land area | 21.3 acres (8.6 ha) |
| Project cost | ₹13.7 crore |
| Village / locality | Palepolam |
| Taluk / tehsil | Naidupet |
| District | Tirupati |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-03804 |
In context
25 applications in Tirupati since January 2022 are in the same category (Buildings & townships): 15 approved, 10 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 21.3 acres, this one is smaller than 64% of them.
38 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Palepolam, Naidupet, Tirupati, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Aroma Ingredients Manufacturing Facility at Plot. Nos. 71 to 84, APIIC SEZ,… — environmental approval granted, 350 m away
- Aroma Ingredients Manufacturing Facility at Plot. Nos. 71 to 84, APIIC SEZ,… — cleared for impact study, 350 m away
- Project by M/s. 3xper Innoventure Limited — initial checks, 1.4 km away
- Inclusion of Commercial scale of products from existing R&D facility, and… — environmental approval granted, 1.4 km away
- Inclusion of Commercial scale of products from existing R&D facility, and… — cleared for impact study, 1.4 km away
- Contract Development and Manufacturing Organization (CDMO) for R&D and API… — lapsed, 1.4 km away
- Contract Development and Manufacturing Organization (CDMO) for R&D and API… — cleared for impact study, 1.4 km away
- Grain Based Ethanol Plant of 200klpd Capacity by M/S. Dammu Biofuels Private… — environmental approval granted, 1.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.