What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Visakhapatnam, Andhra Pradesh

Proposed Mixed Use Developing of IT/ITeS office Space and Residential Space by M/s K. Raheja Corp Real Estate Private Limited

Proposed Mixed Use Developing of IT/ITeS office Space and Residential Space by M/s K. Raheja Corp Real Estate Private Limited is an approved mixed-use project in Madhuravada, Visakhapatnam (Rural), Visakhapatnam, Andhra Pradesh. The site covers 27 acres. Its stated project cost is ₹217.2 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 9 Nov 2026).

See it on the live map All projects in Visakhapatnam

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Mixed Use Developing of IT/ITeS office Space and Residential Space by M/s K. Raheja Corp Real Estate Private Limited is an approved mixed-use project in Madhuravada, Visakhapatnam (Rural), Visakhapatnam, Andhra Pradesh. The site covers 27 acres.

Who is building it?

The applicant is K Raheja Corp Real Estate Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 9 Nov 2026), as of 27 Nov 2026.

Where is it?

In Madhuravada, Visakhapatnam (Rural), Visakhapatnam, Andhra Pradesh.

How big is it?

It has a stated cost of ₹217.2 crore and a site of 27 acres.

When was it filed?

The application was filed on 12 Sept 2026.

Project details

StatusEnvironmental approval granted
Status since9 Nov 2026
Application filed12 Sept 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantK Raheja Corp Real Estate Private Limited
UseMixed use
Land area27 acres (10.9 ha)
Project cost₹217.2 crore
Village / localityMadhuravada
Taluk / tehsilVisakhapatnam (Rural)
DistrictVisakhapatnam
StateAndhra Pradesh
Location fromSite boundary on record
Our referenceWID-AP-03874

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 12 Sept 2026 (this page)Environmental approval granted27 acres₹217.2 crore
Early planning filed 26 Jun 2026Under environmental review27 acres₹217.2 crore

In context

89 applications in Visakhapatnam since January 2022 are in the same category (Buildings & townships): 64 approved, 11 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 27 acres, this one is larger than 75% of them.

48 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Madhuravada, Visakhapatnam (Rural), Visakhapatnam, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 61 K Raheja Corp projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.