Quick answers
What is this project?
Extraction of Ordinary River Sand from the Mohamadapuram Open Sand Reach of 5 Ha., Extent situated in the Pennar River is a proposed mining project in Mahammadapuram, Podalakur, Nellore, Andhra Pradesh. The site covers 12.4 acres.
Who is building it?
The applicant is Ch Swathi.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 8 Oct 2026), as of 27 Nov 2026.
Where is it?
In Mahammadapuram, Podalakur, Nellore, Andhra Pradesh.
How big is it?
It has a stated cost of ₹63 lakh and a site of 12.4 acres.
When was it filed?
The application was filed on 21 Jul 2026.
Project details
| Official title | Extraction of Ordinary River Sand from the Mohamadapuram Open Sand Reach of 5 Ha., Extent situated in the Pennar River at Mohamadapuram Village, Podalakur Mandal, SPSR Nellore District, Andhra Pradesh |
|---|---|
| Status | Cleared for impact study |
| Status since | 8 Oct 2026 |
| Application filed | 21 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ch Swathi |
| Land area | 12.4 acres (5 ha) |
| Project cost | ₹63 lakh |
| Village / locality | Mahammadapuram |
| Taluk / tehsil | Podalakur |
| District | Sri Potti Sriramulu Nellore (Nellore) |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04024 |
In context
232 applications in Nellore since January 2022 are in the same category (Mining): 150 approved, 25 filed or under review, and 57 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.4 acres, this one is larger than 54% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Mahammadapuram, Podalakur, Nellore, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Viruvuru - III Sand Reach — environmental approval granted, 1.2 km away
- 4.650 Ha Viruvuru-Iii Sand Reach — environmental approval granted, 1.2 km away
- Viruvuru-V Sand Reach — environmental approval granted, 1.5 km away
- Viruvuru-V Sand Reach — cleared for impact study, 1.5 km away
- Laying of Under Ground Optical Fibre Cable (OFC) between Kovur-Atmakur under… — more information requested, 5.6 km away
- 4.580 Ha. of Road Metal/Building Stone Quarry of Smt. D.Mamatha Rani,… — environmental approval granted, 5.9 km away
- 1.85 Hectares of Road Metal & Building Stone Quarry of Smt D. Mamatha Rani Sy.… — cleared for impact study, 6.1 km away
- Diversion of 1.85 Ha in Compartment No.376 of Sangam Rf of Atmakur Range of… — in-principle approval, conditions pending, 6.2 km away
More from Ch Swathi in Sri Potti Sriramulu Nellore
- Bharath Singh Colony and Deenayal Nagar areas Open Sand Reach (25.00 Ha) — more information requested
- Leguntapadu Open Sand Reach 16.137 Ha — more information requested
- Extraction of Ordinary River Sand from the Telugurayapuram Open Sand Reach of… — cleared for impact study
- Leguntapadu Open Sand Reach 16.137 Ha — cleared for impact study
- Bharath Singh Colony and Deenayal Nagar areas Open Sand Reach (25.00 Ha) — cleared for impact study
- Bharath Singh Colony and Deenayal Nagar Areas Open Sand Reach (25.00 Ha) for… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.