Under environmental reviewIndustry · Anantpur, Andhra Pradesh

Expansion of Steel Plant – DRI Kilns (Sponge Iron from 33,000 TPA to 1,32,000 TPA), New Induction Furnaces

Expansion of Steel Plant – DRI Kilns (Sponge Iron from 33,000 TPA to 1,32,000 TPA), New Induction Furnaces is a proposed industrial project in Hiradahalu, D.Hirehal, Anantpur, Andhra Pradesh. The site covers 112.4 acres. Its stated project cost is ₹530.9 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 5 Nov 2026).

See it on the live map All projects in Anantpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Steel Plant – DRI Kilns (Sponge Iron from 33,000 TPA to 1,32,000 TPA), New…

Project details

Official titleExpansion of Steel Plant – DRI Kilns (Sponge Iron from 33,000 TPA to 1,32,000 TPA), New Induction Furnaces along with CCM & LRF (Hot Billets/MS Billets/ Ingots)-3,96,000 TPA, Rolling Mill (TMT Bars/Structural Steel Strips/MS Pipes/ MS Tubes/Galvanized Pipes - 3,96,000 TPA (85 % Hot charging remaining 15% through RHF with LDO/Producer Gas as fuel), Coal Gasifier for Reheating Furnace – 3,500 Nm3/hr., WHRB based Power Plant - 8.0 MW, FBC based Power Plant - 4.0 MW, Brick Manufacturing unit - 13,0
StatusUnder environmental review
Status since5 Nov 2026
Application filed27 Jan 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantHariom Pipe Industries Limited
Land area112.4 acres (45.5 ha)
Project cost₹530.9 crore
Village / localityHiradahalu
Taluk / tehsilD.Hirehal
DistrictAnantpur
StateAndhra Pradesh
Location fromSite boundary on record
Our referenceWID-AP-04087

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 27 Jan 2026 (this page)Under environmental review112.4 acres₹530.9 crore
Early planning filed 3 Apr 2025Cleared for impact study112.4 acres₹530.9 crore

In context

18 applications in Anantpur since January 2022 are in the same category (Industry): 11 approved, 3 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 112.4 acres, this one is smaller than 72% of them.

10 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Hiradahalu, D.Hirehal, Anantpur, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Hariom Pipe Industries projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.