Quick answers
What is this project?
Quarry lease over an extent of 4.80 Ha held by Sri Kotapati Malyadri (Formerly M/s Vallabhaneni Constructions) is an approved mining project in Chundi, Voletivaripalem, Nellore, Andhra Pradesh. The site covers 11.9 acres.
Who is building it?
The applicant is Kotapati Malyadri.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Oct 2026), as of 27 Nov 2026.
Where is it?
In Chundi, Voletivaripalem, Nellore, Andhra Pradesh.
How big is it?
It has a stated cost of ₹50 lakh and a site of 11.9 acres.
When was it filed?
The application was filed on 25 Jun 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Oct 2026 |
| Application filed | 25 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Kotapati Malyadri |
| Land area | 11.9 acres (4.8 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Chundi |
| Taluk / tehsil | Voletivaripalem |
| District | Sri Potti Sriramulu Nellore (Nellore) |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04090 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 25 Jun 2026 (this page) | Environmental approval granted | 11.9 acres | ₹50 lakh |
| Ownership transfer filed 23 May 2026 | Not approved | 11.9 acres | ₹50 lakh |
In context
232 applications in Nellore since January 2022 are in the same category (Mining): 150 approved, 25 filed or under review, and 57 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 11.9 acres, this one is smaller than 59% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Chundi, Voletivaripalem, Nellore, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Quarry lease over an extent of 4.80 Ha held by Sri Kotapati Malyadri (Formerly… — not approved, 0 m away
- Mining project by M/s Vallabhaneni Constructions, Mg.Dt:Sri V.Venkateswara Rao — environmental approval granted, 0 m away
- Prospecting for Iron Ore in Lakshmakapalle South Iron Ore Block of M/s JSW… — forest land use approved, 3.5 km away
- G2 Level Prospecting for Iron Ore in Addankivaripalem Iron Ore Block of M/s… — forest land use approved, 4.1 km away
- Prospecting for Iron Ore in Addankivaripalem Iron Ore Block of M/s JSW Steel… — forest land use approved, 4.1 km away
- Prospecting for Iron Ore in Addankivaripalem Iron Ore Block of M/s JSW Steel… — forest land use approved, 4.1 km away
- Prospecting for Iron Ore in Addankivaripalem Iron Ore Block of M/s JSW Steel… — lapsed, 4.1 km away
- diversion of Forest land for grant of quarry lease for Quartz over an extent… — under forest review, 5.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.