Quick answers
What is this project?
This rejected mining project by M/s. P.V.R. Chalapathi Metal Industries – 1.186 Ha is in Perecherla, Medikonduru, Guntur, Andhra Pradesh. The site covers 2.9 acres.
Who is building it?
The applicant is Pilla Venkateswararao.
Has it been approved?
No. The application was rejected on 6 Mar 2026.
Where is it?
In Perecherla, Medikonduru, Guntur, Andhra Pradesh.
How big is it?
It has a stated cost of ₹20 lakh and a site of 2.9 acres.
When was it filed?
The application was filed on 24 Jan 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Mining project by M/s. P.V.R. Chalapathi Metal Industries – 1.186 Ha
Project details
| Status | Not approved |
|---|---|
| Status since | 6 Mar 2026 |
| Application filed | 24 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Pilla Venkateswararao |
| Land area | 2.9 acres (1.2 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Perecherla |
| Taluk / tehsil | Medikonduru |
| District | Guntur |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04163 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Validity extension filed 24 Jan 2026 (this page) | Not approved | 2.9 acres | ₹20 lakh |
| New project filed 18 Feb 2025 | Environmental approval granted | 2.9 acres | ₹20 lakh |
In context
164 applications in Guntur since January 2022 are in the same category (Mining): 104 approved, 16 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.9 acres, this one is smaller than 60% of them.
31 other mining leases have applied within 500 m of this site; together with this one they cover 463.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 76 mining leases have applied within 5 km.
Where it is
Perecherla, Medikonduru, Guntur, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s. P.V.R. Chalapathi Metal Industries – 1.186 Ha — environmental approval granted, 0 m away
- PVR Chalapathi Metal Industries - 1.186 Ha — environmental approval granted, 0 m away
- Mining project by M/s. The Hanuman Nagar Vaddera Labour Contract Co-Operative… — environmental approval granted, 50 m away
- Mining project by M/s. P.V.R. Chalapathi Metal Industries – 1.214 Ha — lapsed, 100 m away
- Mining project by M/s. P.V.R. Chalapathi Metal Industries – 1.214 Ha — environmental approval granted, 100 m away
- Mining project by M/s. Terra Mines and Metals Private Limited – 0.507 Ha — lapsed, 100 m away
- Mining project by M/s.Sai Yasasvi Stone Crusher- 1.404 HA — lapsed, 150 m away
- Mining project by M/s.Sai Yasasvi Stone Crusher- 1.404 HA — environmental approval granted, 150 m away
More from Pilla Venkateswararao in Guntur
- Mining project by M/s. Sri Gayatri Stone Crusher – 1.568 Ha — more information requested
- Mining project by M/s. P.V.R. Chalapathi Metal Industries – 1.568 Ha — more information requested
- Mining project by M/s. P.V.R. Chalapathi Metal Industries – 1.214 Ha — lapsed
- Venkateswra Stone Industries - 1.00 Ha — lapsed
- P V R Chalapathi Metal Industries - 1.00 Ha — lapsed
- Mining project by M/s. PVR Chalapathi Metal Industries- 4.484 HA — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.