Quick answers
What is this project?
Proposed green-field manufacturing facility of different Grades of Carbon Black of 3,00,720 TPA (840 TPD) and Waste Heat Recovery Based Cogeneration Captive Power plant of 48 MW at Plot No. 23, 24, 25, 27 and 28 in Naidupeta Notified APIIC Industrial Park (proposed denotified SEZ Area) is an approved industrial project in Dwarakapuram, Naidupet, Tirupati, Andhra Pradesh. The site covers 116.6 acres.
Who is building it?
The applicant is Pcbl (Tn) Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 Nov 2026), as of 27 Nov 2026.
Where is it?
In Dwarakapuram, Naidupet, Tirupati, Andhra Pradesh.
How big is it?
It has a stated cost of ₹2,717 crore and a site of 116.6 acres.
When was it filed?
The application was filed on 25 Aug 2026.
Project details
| Official title | Proposed green-field manufacturing facility of different Grades of Carbon Black of 3,00,720 TPA (840 TPD) and Waste Heat Recovery Based Cogeneration Captive Power plant of 48 MW at Plot No. 23, 24, 25, 27 and 28 in Naidupeta Notified APIIC Industrial Park (proposed denotified SEZ Area) in Palachuru Village of Pellakuru Mandal and in Dwarakapuram Village of Naidupeta Mandal, Tirupati District of Andhra Pradesh. |
|---|---|
| Status | Environmental approval granted |
| Status since | 9 Nov 2026 |
| Application filed | 25 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Pcbl (Tn) Limited |
| Land area | 116.6 acres (47.2 ha) |
| Project cost | ₹2,717 crore |
| Village / locality | Dwarakapuram |
| Taluk / tehsil | Naidupet |
| District | Tirupati |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04253 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 25 Aug 2026 (this page) | Environmental approval granted | 116.6 acres | ₹2,717 crore |
| New project filed 16 May 2026 | Environmental approval granted | 116.6 acres | ₹2,717 crore |
| Early planning filed 2 Jan 2026 | Cleared for impact study | 116.6 acres | ₹2,717 crore |
In context
48 applications in Tirupati since January 2022 are in the same category (Industry): 30 approved, 8 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 116.6 acres, this one is larger than 85% of them.
36 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dwarakapuram, Naidupet, Tirupati, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed green-field manufacturing facility of different Grades of Carbon… — environmental approval granted, 0 m away
- Proposed green-field manufacturing facility of different Grades of Carbon… — cleared for impact study, 0 m away
- Industrial project by M/s. BIRLA CARBON AP PRIVATE LIMITED — cleared for impact study, 1.2 km away
- Industrial project by M/s. BIRLA CARBON AP PRIVATE LIMITED — lapsed, 1.2 km away
- Industrial project by M/s. BIRLA CARBON AP PRIVATE LIMITED — environmental approval granted, 1.2 km away
- Project by M/s. 3xper Innoventure Limited — initial checks, 1.6 km away
- Inclusion of Commercial scale of products from existing R&D facility, and… — environmental approval granted, 1.6 km away
- Inclusion of Commercial scale of products from existing R&D facility, and… — cleared for impact study, 1.6 km away
3 Pcbl (Tn) projects in Tirupati
All 6 Pcbl (Tn) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.