What is Developing? Open the mapMap

Cleared for impact studyWater & irrigation · Y.S.R., Andhra Pradesh

Gandikota Pumped Storage Project (1800 MW)

Gandikota Pumped Storage Project (1800 MW) is a proposed water and irrigation project in K.Bommepalle, Kondapuram, Y.S.R., Andhra Pradesh. The site covers 312.5 acres. Its stated project cost is ₹8,010 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 19 Oct 2026).

See it on the live map All projects in Y.S.R.

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusCleared for impact study
Status since19 Oct 2026
Application filed20 Jul 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorWater & irrigation
ApplicantADANi RENEWABLE ENERGY FIFTY ONE LIMITED
Land area312.5 acres (126.5 ha)
Project cost₹8,010 crore
Village / localityK.Bommepalle
Taluk / tehsilKondapuram
DistrictY.S.R.
StateAndhra Pradesh
Location fromSite boundary on record
Our referenceWID-AP-04254

In context

13 applications in Y.S.R. since January 2022 are in the same category (Water & irrigation): 9 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 312.5 acres, this one is smaller than 77% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

K.Bommepalle, Kondapuram, Y.S.R., Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.