What is Developing? Open the mapMap

Under environmental reviewIndustry · Vizianagaram, Andhra Pradesh

EC name change from M/s. Shree Mahalakshmi Smelters (P) Ltd to M/s. Indsil Hydro Power and Manganese Ltd

EC name change from M/s. Shree Mahalakshmi Smelters (P) Ltd to M/s. Indsil Hydro Power and Manganese Ltd is a proposed industrial project in Budrayavalasa, Merakamudidam, Vizianagaram, Andhra Pradesh. The site covers 20.2 acres. Its stated project cost is ₹56.2 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 19 Nov 2026).

See it on the live map All projects in Vizianagaram

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

EC name change from M/s. Shree Mahalakshmi Smelters (P) Ltd to M/s. Indsil Hydro Power and Manganese Ltd is a proposed industrial project in Budrayavalasa, Merakamudidam, Vizianagaram, Andhra Pradesh. The site covers 20.2 acres.

Who is building it?

The applicant is Indsil Hydro Power and Manganese Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Budrayavalasa, Merakamudidam, Vizianagaram, Andhra Pradesh.

How big is it?

It has a stated cost of ₹56.2 crore and a site of 20.2 acres.

When was it filed?

The application was filed on 4 Jun 2026.

Project details

StatusUnder environmental review
Status since19 Nov 2026
Application filed4 Jun 2026
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorIndustry
ApplicantIndsil Hydro Power and Manganese Limited
Land area20.2 acres (8.2 ha)
Project cost₹56.2 crore
Village / localityBudrayavalasa
Taluk / tehsilMerakamudidam
DistrictVizianagaram
StateAndhra Pradesh
Location fromSite boundary on record
Our referenceWID-AP-04282

In context

40 applications in Vizianagaram since January 2022 are in the same category (Industry): 25 approved, 10 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 20.2 acres, this one is smaller than 60% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Budrayavalasa, Merakamudidam, Vizianagaram, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.