Project details
| Status | Lapsed |
|---|---|
| Status since | 8 Sept 2026 |
| Application filed | 25 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Garuda Road Metal and Mines LLP |
| Land area | 6.2 acres (2.5 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Ramireddigaripalle |
| Taluk / tehsil | Pulicherla |
| District | Chittoor |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04332 |
In context
364 applications in Chittoor since January 2022 are in the same category (Mining): 237 approved, 33 filed or under review, and 94 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 6.2 acres, this one is smaller than 63% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Ramireddigaripalle, Pulicherla, Chittoor, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sri O. Arun Kumar Reddy — environmental approval granted, 4.8 km away
- Sri O. Arun Kumar Reddy — environmental approval granted, 4.8 km away
- Sri G Murali Mohan Reddy — lapsed, 7.6 km away
- R Bindhu - 4.722 Ha — environmental approval granted, 15.9 km away
- Mining project by M/s. Yashwanth Granites — more information requested, 18.9 km away
- Mining project by M/s RCN Infra, Prop. Smt Chava Anvika — initial checks, 19 km away
- Four Laning Pileru – Kalur From Km 55+900 to Km 95+717 Section of NH-71 of… — under wildlife review, 20.3 km away
- Mining project by M/s VSV Minerals — environmental approval granted, 21.8 km away