Quick answers
What is this project?
This proposed mining project by M/s.Northeast Infrastructure Private Limited, Director:Nadimpalli Venkata Rama Raju (2.698 Ha) is in Pakivalasa, Kotabommali, Srikakulam, Andhra Pradesh. The site covers 6.7 acres.
Who is building it?
The applicant is North East Infrastructure Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Pakivalasa, Kotabommali, Srikakulam, Andhra Pradesh.
How big is it?
It has a stated cost of ₹43 lakh and a site of 6.7 acres.
When was it filed?
The application was filed on 11 Oct 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 18 Nov 2026 |
| Application filed | 11 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | North East Infrastructure Private Limited |
| Land area | 6.7 acres (2.7 ha) |
| Project cost | ₹43 lakh |
| Village / locality | Pakivalasa |
| Taluk / tehsil | Kotabommali |
| District | Srikakulam |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04449 |
In context
286 applications in Srikakulam since January 2022 are in the same category (Mining): 209 approved, 37 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 6.7 acres, this one is smaller than 78% of them.
No other mining lease on record is within 500 m of this site; 11 have applied within 5 km.
Where it is
Pakivalasa, Kotabommali, Srikakulam, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s. Shamirpet Logistics Hub Private Limited, Director:… — under environmental review, 550 m away
- by M/s.Shamirpet Logistics Hub Private Limited, Director:Nadimpalli Venkata… — under environmental review, 900 m away
- Mining project by M/s. Shamirpet Logistics Hub Private Limited, Director:… — under environmental review, 2.7 km away
- Mining project by M/s. Mavric & Company, MORRUM,GRAVEL AND ORDINARY EARTH -4.950 — environmental approval granted, 3.7 km away
- Mining project by M/s. Mavric & Company, — environmental approval granted, 4.1 km away
- Mining project by M/s. Sai Mines and Minerals — environmental approval granted, 4.4 km away
- Mining project by M/s Aditya Stone Crusher, Proprietor: Smt M.Bharathi — lapsed, 4.5 km away
- Sri Jayasuriya GG, Quarry lease over an extent of 4.990 Ha — under environmental review, 4.5 km away
More from North East Infrastructure Private Limited in Srikakulam
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.