Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 9 Jul 2026 |
| Application filed | 24 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Jaya Prakash Nimmagadda |
| Land area | 12.4 acres (5 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Paritala |
| Taluk / tehsil | Kanchikacherla |
| District | Ntr |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04587 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 24 Apr 2026 (this page) | Cleared for impact study | 12.4 acres | ₹30 lakh |
| Early planning filed 3 Mar 2026 | Cleared for impact study | 9.9 acres | ₹50 lakh |
In context
243 applications in Ntr since January 2022 are in the same category (Mining): 182 approved, 31 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.4 acres, this one is larger than 75% of them.
16 other mining leases have applied within 500 m of this site; together with this one they cover 157.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 65 mining leases have applied within 5 km.
Where it is
Paritala, Kanchikacherla, Ntr, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s Sri Saradha Stone Crusher, Prop: Sri N.Jaya Prakash_5.0… — not approved, 0 m away
- Mining project by M/s Sri Saradha Stone Crusher, Prop: Sri N.Jaya Prakash (5.0… — environmental approval granted, 0 m away
- Mining project by M/s JP Stone Crusher, Mg.P Sri N. Naresh — cleared for impact study, 150 m away
- Mining project by M/s SARADA STONE CRUSHER, PROP: SRI JAYA PRAKASH NIMMAGADDA — cleared for impact study, 150 m away
- M/s Sri Sarada Stone Crusher, Prop: Sri Jayaprakash Nimmagadda (1.610 Ha -… — not approved, 150 m away
- Sri Nimmagadda Ramesh– 1.350 Ha — environmental approval granted, 150 m away
- Mining project by M/s Sri Siva Balaji Crushers — environmental approval granted, 250 m away
- Mining project by M/s Sri Siva Balaji Crushers — cleared for impact study, 250 m away
More from Jaya Prakash Nimmagadda in Ntr
- Mining project by M/s Sri Saradha Stone Crusher, Prop: Sri N.Jaya Prakash_5.0… — not approved
- M/s Sri Sarada Stone Crusher, Prop: Sri Jayaprakash Nimmagadda (1.610 Ha -… — not approved
- Mining project by M/s Sri Saradha Stone Crusher, Prop: Sri N.Jaya Prakash (5.0… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.