One of 3 filings for this project. The project's main page, with every filing and where each stands: Bsnl 4g Saturation Project _batukulapaya , Veldurthy Mandal, Palnadu…
Project details
| Status | Lapsed |
|---|---|
| Status since | 4 Oct 2026 |
| Application filed | 29 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹1 crore |
| Village / locality | Rf |
| Taluk / tehsil | Durgi |
| District | Palnadu |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04688 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 16 Sept 2026 | Under wildlife review | 0 acres | ₹1 crore |
| New project filed 29 Aug 2026 (this page) | Lapsed | 0 acres | ₹1 crore |
| New project filed 29 Aug 2026 | More information requested | 0 acres | ₹1 crore |
In context
10 applications in Palnadu since January 2022 are in the same category (Other): 1 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
Where it is
Rf, Durgi, Palnadu, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bsnl 4g Saturation Project _batukulapaya , Veldurthy Mandal, Palnadu… — more information requested, 0 m away
- Bsnl 4g Saturation Project _batukulapaya , Veldurthy Mandal, Palnadu… — under wildlife review, 0 m away
- BSNL 4G SATURATION PROJECT _Siluvakonda , VELDURTHY MANDAL, PALNADU… — more information requested, 6.6 km away
- Bsnl 4g Saturation Project _kunkuduchettu Penta , Veldurthy Mandal, Palnadu… — under wildlife review, 7 km away
- Varikapudisela Lift Irrigation Scheme by Water Resource Department — cleared for impact study, 7.1 km away
- Kandlagunta-Dwarakapuri — lapsed, 26.2 km away
- Diversion of 0.78 ha of Forest Land for laying of Optical Fiber Cable(OFC)… — more information requested, 26.3 km away
- Laying of Under Ground Optical Fiber Cable — more information requested, 30.3 km away
More from Mahesh Nair in Palnadu
- BSNL 4G SATURATION PROJECT _Siluvakonda , VELDURTHY MANDAL, PALNADU… — more information requested
- Bsnl 4g Saturation Project _kunkuduchettu Penta , Veldurthy Mandal, Palnadu… — under wildlife review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.