Quick answers
What is Pumped Storage Project(9X150MW)?
Pumped Storage Project(9X150MW) is an approved water and irrigation project in Rf, Gudem Kotha Veedhi, Alluri Sitharama Raju, Andhra Pradesh. The site covers 613.1 acres.
Who is building it?
The applicant is Andhra Pradesh Power Generation Corporation Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 27 Jul 2026), as of 27 Nov 2026.
Where is it?
In Rf, Gudem Kotha Veedhi, Alluri Sitharama Raju, Andhra Pradesh.
How big is it?
It has a stated cost of ₹11,881.5 crore; a site of 613.1 acres and 317.8 acres (128.6 ha) of forest land.
When was it filed?
The application was filed on 13 May 2024.
Project details
| Official title | Pumped Storage Project(9X150MW) at Upper Sileru village , Godem Kotha Veedhi (M) |
|---|---|
| Status | Forest land use approved |
| Status since | 27 Jul 2026 |
| Application filed | 13 May 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Andhra Pradesh Power Generation Corporation Limited |
| Land area | 613.1 acres (248.1 ha) |
| Forest land | 317.8 acres (128.6 ha) |
| Project cost | ₹11,881.5 crore |
| Village / locality | Rf |
| Taluk / tehsil | Gudem Kotha Veedhi |
| District | Alluri Sitharama Raju |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04699 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 May 2024 (this page) | Forest land use approved | 613.1 acres | ₹11,881.5 crore |
| New project filed 11 Jan 2024 | Environmental approval granted | 613.1 acres | ₹11,881.5 crore |
In context
8 applications in Alluri Sitharama Raju since January 2022 are in the same category (Water & irrigation): 8 approved, 0 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rf, Gudem Kotha Veedhi, Alluri Sitharama Raju, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Pumped Storage Project(9X150MW) — environmental approval granted, 0 m away
- Development of Water Aerodrome at Sileru - Lambasingi, Andhra Pradesh — cleared for impact study, 2.5 km away
- Formation and Bt to the Road From A.Darakonda to Akuluru of G.K.Veedhi Mandal — more information requested, 18.8 km away
- Road from Darakonda to Durgam via jajipakalu of G.K Veedhi Mandal — more information requested, 20.1 km away
- Laying of Iron Ore Pipeline for Pelletization Plant Through Forest Areas of… — in-principle approval, conditions pending, 22.5 km away
- Formation and BT to the road from Pamurai Jn to Puttakota of G.K.Veedhi Mandal — lapsed, 24.5 km away
- Formation and Bt to the Road Including Construction of Culverts From P.Kothuru… — more information requested, 26.2 km away
- Formation and Bt to the Road From P.Kothuru to Kothavedurupalem — more information requested, 26.2 km away
All 3 Andhra Pradesh Power Generation Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.