Quick answers
What is this project?
Rehabilitation and Upgradation of NH-340C from Kurnool (Existing Km5.400 of NH-40/Design Km0.000) to Mandlem (Existing Km38.000/Design Km 30.600) (PKG-1) to 4 Lane with paved shoulders (Design length 30.600 km) in the state of Andhra Pradesh under NH(O) on Hybrid Annuity Mode is an approved road project in Damagatla, Nandikotkur, Nandyal, Andhra Pradesh. The site covers 5.2 acres.
Who is building it?
The applicant is National Highways Authority of India (NHAI).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 16 May 2025), as of 27 Nov 2026.
Where is it?
In Damagatla, Nandikotkur, Nandyal, Andhra Pradesh.
How big is it?
It has a stated cost of ₹863.9 crore; a site of 5.2 acres and 5.2 acres (2.1 ha) of forest land.
When was it filed?
The application was filed on 28 Sept 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 16 May 2025 |
| Application filed | 28 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | National Highways Authority of India (NHAI) |
| Land area | 5.2 acres (2.1 ha) |
| Forest land | 5.2 acres (2.1 ha) |
| Project cost | ₹863.9 crore |
| Village / locality | Damagatla |
| Taluk / tehsil | Nandikotkur |
| District | Nandyal |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04867 |
In context
10 applications in Nandyal since January 2022 are in the same category (Roads & highways): 2 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Damagatla, Nandikotkur, Nandyal, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Quarry Lease Area Over an Extent of 4.250 Hects of Psk Infrastructure and… — environmental approval granted, 2.5 km away
- M/s. Indosol Solar Private Limited - Quartzite mine - 18.071 ha — cleared for impact study, 4.2 km away
- Mining project by Shiridi Sai Electricals Limited — environmental approval granted, 11.1 km away
- Mining project by Shiridi Sai Electricals Limited — cleared for impact study, 11.1 km away
- Pinnapuram Integrated RESP — lapsed, 21.9 km away
- Diversion of 77.17 Ha additional Forest Land (46.42 Ha in Kurnool Range,… — in-principle approval, conditions pending, 22.2 km away
- Diversion of 0.19 Ha Additional Forest land for establishment of Integrated… — lapsed, 23.5 km away
- Electrification of PVTG Habitations under PM-JANMAN — lapsed, 24.2 km away
All 548 National Highways Authority of India (NHAI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.