LapsedRoads & highways · Sri Sathya Sai, Andhra Pradesh

Rehabilitation & Up-Gradation of Existing Two Lane Road to Four Lane Road From Km 0/00 to 60/000 of Muddanur – Pulivendula – Hindupur Road of Nh-716g and Widening and Reconstruction of Existing 2 Lane Road to 4 Lane From Km 56+400 to Km 120+300 (I.E. B.Kothapalli Junction to Gorantla)(Excluding Kadiri Bypass From Km 70+200 to Km 77+105) of Nh-716g in the State of Andhra Pradesh on Epc Mode

Rehabilitation & Up-Gradation of Existing Two Lane Road to Four Lane Road From Km 0/00 to 60/000 of Muddanur – Pulivendula – Hindupur Road of Nh-716g and Widening and Reconstruction of Existing 2 Lane Road to 4 Lane From Km 56+400 to Km 120+300 (I.E. B.Kothapalli Junction to Gorantla)(Excluding Kadiri Bypass From Km 70+200 to Km 77+105) of Nh-716g in the State of Andhra Pradesh on Epc Mode is a lapsed road project in Allapalle, Obuladevaracheruvu, Sri Sathya Sai, Andhra Pradesh. The site covers 0.2 acres. Its stated project cost is ₹19.2 crore. As of 27 Nov 2026, its status is “Lapsed” (since 2 Jan 2024).

See it on the live map All projects in Sri Sathya Sai

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Rehabilitation & Up-Gradation of Existing Two Lane Road to Four Lane Road From Km 0/00 to 60/000 of Muddanur – Pulivendula – Hindupur Road of Nh-716g and Widening and Reconstruction of Existing 2 Lane Road to 4 Lane From Km 56+400 to Km 120+300 (I.E. B.Kothapalli Junction to Gorantla)(Excluding Kadiri Bypass From Km 70+200 to Km 77+105) of Nh-716g in the State of Andhra Pradesh on Epc Mode is a lapsed road project in Allapalle, Obuladevaracheruvu, Sri Sathya Sai, Andhra Pradesh. The site covers 0.2 acres.

Who is building it?

The applicant is Ministry of Road Transport and Highways Govt of India.

Has it been approved?

No. The application was lapsed on 2 Jan 2024, so it is no longer under consideration.

Where is it?

In Allapalle, Obuladevaracheruvu, Sri Sathya Sai, Andhra Pradesh.

How big is it?

It has a stated cost of ₹19.2 crore; a site of 0.2 acres and 55.3 acres (22.4 ha) of forest land.

When was it filed?

The application was filed on 18 Sept 2023.

Project details

StatusLapsed
Status since2 Jan 2024
Application filed18 Sept 2023
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantMinistry of Road Transport and Highways Govt of India
Land area700 m²
Forest land55.3 acres (22.4 ha)
Project cost₹19.2 crore
Village / localityAllapalle
Taluk / tehsilObuladevaracheruvu
DistrictSri Sathya Sai
StateAndhra Pradesh
Location fromSite boundary on record
Our referenceWID-AP-04884

In context

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Allapalle, Obuladevaracheruvu, Sri Sathya Sai, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ministry of Road Transport and Highways Govt of India in Sri Sathya Sai

All 10 Ministry of Road Transport and Highways Govt of India projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.