Project details
| Status | Lapsed |
|---|---|
| Status since | 5 Sept 2025 |
| Application filed | 16 Jun 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Railways & metro |
| Applicant | South Central Railway |
| Land area | 76.4 acres (30.9 ha) |
| Forest land | 22.8 acres (9.2 ha) |
| Project cost | ₹16 crore |
| Village / locality | Rf |
| Taluk / tehsil | Jaggayyapeta |
| District | Ntr |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04906 |
In context
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rf, Jaggayyapeta, Ntr, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ramco Budawada Limestone Mine (Rf)-160 Ha. :- Extension of Forest Clearance… — lapsed, 1.3 km away
- Haul Road — lapsed, 2.8 km away
- The KCP Limited, Cement Unit-II — cleared for impact study, 3.2 km away
- Industrial project by M/S the Kcp Limited, Cement Unit-Ii — initial checks, 3.2 km away
- Project by Cohance Lifesciences Limited — initial checks, 4 km away
- Expansion of Integrated Cement Plant - Clinker 3.6 to 8.33 Million TPA (Line… — cleared for impact study, 4.7 km away
- Industrial project by M/S.ULTRA TECH CEMENT LIMITED (Unit. M/s. Balaji Cement… — initial checks, 4.7 km away
- Expansion of Integrated Cement Plant - Clinker (3.6 to 7.6 Million TPA),… — lapsed, 4.7 km away
All 10 South Central Railway projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.