Project details
| Status | Forest land use approved |
|---|---|
| Status since | 22 Oct 2026 |
| Application filed | 4 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Annamayya Pumped Storage Project Private Limited |
| Land area | 1.6 acres (0.6 ha) |
| Forest land | 1.6 acres (0.6 ha) |
| Project cost | ₹1.1 crore |
| Village / locality | Veeraballe |
| Taluk / tehsil | Veeraballe |
| District | Annamayya |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04913 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Oct 2026 (this page) | Forest land use approved | 1.6 acres | ₹1.1 crore |
| New project filed 8 Dec 2025 | Under wildlife review | 1.6 acres | ₹1.1 crore |
In context
6 applications in Annamayya since January 2022 are in the same category (Buildings & townships): 1 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Veeraballe, Annamayya, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Permission for Drilling of 26 Nos. Boreholes over an Area of 0.63 Ha in… — under wildlife review, 0 m away
- Veeraballi Off stream Closed Loop Pumped Storage Project — lapsed, 200 m away
- Veeraballi Off stream Closed Loop Pumped Storage Project — lapsed, 200 m away
- Veeraballi Off stream Closed Loop Pumped Storage Project — lapsed, 200 m away
- Borehole Drilling Permission for Veeraballi Off-Stream Closed Loop Pumped… — more information requested, 350 m away
- Borehole Drilling Permission for Veeraballi Off-Stream Closed Loop Pumped… — lapsed, 350 m away
- Borehole Drilling Permission for Veeraballi Off-Stream Closed Loop Pumped… — lapsed, 350 m away
- Borehole Drilling Permission for Veeraballi Off-Stream Closed Loop Pumped… — lapsed, 350 m away
More from Annamayya Pumped Storage Project Private Limited in Annamayya
- Veeraballi Off stream Closed Loop Pumped Storage Project — lapsed
- Veeraballi Off stream Closed Loop Pumped Storage Project — lapsed
All 4 Annamayya Pumped Storage projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.