One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of 0.87 Ha of Forest Land for Construction of Mobile Tower for Provision of 4G…
Project details
| Official title | Diversion of 0.87 Ha of Forest Land for Construction of Mobile Tower for Provision of 4G based mobile services at MHA identified locations in Left Wing Extremism (LWE-II) affected areas falling in Chinnamanthanala(v)Dornala(m), Jendapenta(v) Veldurthy (m), Nekkanti(v) Prakasam(m) in Markapur Forest Division in Prakasam District, Andhra Pradesh State. |
|---|---|
| Status | Lapsed |
| Status since | 8 Aug 2024 |
| Application filed | 11 Jan 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Bharti Airtel Limited |
| Land area | 2.1 acres (0.9 ha) |
| Forest land | 2.1 acres (0.9 ha) |
| Project cost | ₹75 lakh |
| Village / locality | China Manthanala |
| Taluk / tehsil | Dornala |
| District | Prakasam |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-05016 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 Jan 2024 | More information requested | 2.1 acres | ₹75 lakh |
| New project filed 11 Jan 2024 (this page) | Lapsed | 2.1 acres | ₹75 lakh |
In context
12 applications in Prakasam since January 2022 are in the same category (Telecom): 2 approved, 6 filed or under review, and 4 withdrawn, lapsed or rejected. At 2.1 acres, this one is larger than 75% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
China Manthanala, Dornala, Prakasam, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.87 Ha of Forest Land for Construction of Mobile Tower for… — more information requested, 0 m away
- BSNL 4G SATURATION PROJECT_Peddamanthanala_PRAKASAM_ANDHRAPRADESH — decision issued, 2.5 km away
- BSNL 4G SATURATION PROJECT_Peddamanthanala_PRAKASAM_ANDHRAPRADESH — forest land use approved, 2.5 km away
- laying of Optical Fiber Cable along the Road within in the existing Right of… — lapsed, 2.5 km away
- laying of Optical Fiber Cable along the Road within in the existing Right of… — more information requested, 2.5 km away
- BSNL 4G SATURATION PROJECT_Ayynnakunta_PRAKASAM_ANDHRAPRADESH — lapsed, 4.2 km away
- BSNL 4G SATURATION PROJECT_Ayynnakunta_PRAKASAM_ANDHRAPRADESH — more information requested, 4.2 km away
- BSNL 4G SATURATION PROJECT_Korraprolu_PRAKASAM_ANDHRAPRADESH — more information requested, 5.1 km away
More from Bharti Airtel Limited in Prakasam
- laying of Optical Fiber Cable along the Road within in the existing Right of… — lapsed
- laying of Optical Fiber Cable along the Road within in the existing Right of… — more information requested
- Diversion of 0.53 Ha of Forest Land for Construction of Mobile Tower for… — forest land use approved
- Diversion of 0.03 Ha of Forest Land for Construction of Mobile Tower for… — more information requested
- Diversion of 0.03 Ha of Forest Land for Construction of Mobile Tower for… — forest land use approved
7 Bharti Airtel (Airtel) projects in Prakasam
All 485 Bharti Airtel (Airtel) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.