Project details
| Status | More information requested |
|---|---|
| Status since | 17 Sept 2023 |
| Application filed | 17 Sept 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Project cost | ₹1 crore |
| Village / locality | Forest |
| Taluk / tehsil | Sri Avadhutha Kasinayana |
| District | Y.S.R. |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-05074 |
In context
16 applications in Y.S.R. since January 2022 are in the same category (Other): 2 approved, 8 filed or under review, and 6 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
Where it is
Forest, Sri Avadhutha Kasinayana, Y.S.R., Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- N Viswanath Reddy - 5.00 Ha Road Metal and Gravel Quarry — environmental approval granted, 20.3 km away
- Rajupalem Pumped Storage Project (350 MW) — under environmental review, 20.4 km away
- M/S Dilip Buildcon Limited, Temporary Permit Applied Area for Mining of Road… — environmental approval granted, 21.3 km away
- Temporary Permit for Road Metal and Building Stone, 3.950 Ha (M/s Dilip… — environmental approval granted, 21.3 km away
- Mining project by M/s Mount Vista Private Limited, - 1.00 ha — environmental approval granted, 21.5 km away
- Sri. C.Seetharami Reddy, Road Metal & Building Stone -3.00Ha — environmental approval granted, 22.4 km away
- Express ways, Economic Corridors and inter corridors under Bharatmala… — forest land use approved, 23.2 km away
- Rajupalem Pumped Storage Project — cleared for impact study, 23.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.