Quick answers
What is Kakinada SEZ Port Phase-1?
Kakinada SEZ Port Phase-1 is a lapsed building project in Kona Forest, Thondangi, Kakinada, Andhra Pradesh. The site covers 216.5 acres.
Who is building it?
The applicant is Kakinada Gateway Port Limited.
Has it been approved?
No. The application was lapsed on 5 Jul 2025, so it is no longer under consideration.
Where is it?
In Kona Forest, Thondangi, Kakinada, Andhra Pradesh.
How big is it?
It has a stated cost of ₹2,620 crore and a site of 216.5 acres.
When was it filed?
The application was filed on 20 Jan 2025.
Project details
| Official title | Kakinada SEZ Port Phase-1 at Kona Village in Thondangi Mandal, Kakinada District, Andhra Pradesh. |
|---|---|
| Status | Lapsed |
| Status since | 5 Jul 2025 |
| Application filed | 20 Jan 2025 |
| Approval sought | Coastal review |
| Application type | Amendment |
| Sector | Buildings & townships |
| Applicant | Kakinada Gateway Port Limited |
| Land area | 216.5 acres (87.6 ha) |
| Project cost | ₹2,620 crore |
| Village / locality | Kona Forest |
| Taluk / tehsil | Thondangi |
| District | Kakinada |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-05154 |
In context
7 applications in Kakinada since January 2022 are in the same category (Buildings & townships): 3 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected.
23 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kona Forest, Thondangi, Kakinada, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kakinada SEZ Port Phase-1 — environmental approval granted, 500 m away
- PROPOSED 2,00,000 TPA NON-RECOVERY TYPE COKE OVEN PLANT — environmental approval granted, 1.9 km away
- PROPOSED 2,00,000 TPA NON-RECOVERY TYPE COKE OVEN PLANT — cleared for impact study, 1.9 km away
- Industrial project by M/s. Neuland Laboratories Ltd Kakinada Site — under environmental review, 2 km away
- Industrial project by M/s. Neuland Laboratories Ltd Kakinada Site — cleared for impact study, 2 km away
- Project by M/s Lyfius Pharma Pvt. Ltd., (formerly M/s Aurobindo Antibiotics… — lapsed, 2.6 km away
- Transfer of name of company on the existing Environmental Clearance from M/s.… — lapsed, 2.6 km away
- Amendment in Existing Ec for Sy. Nos., Site Area, Sea Water Intake Quantity… — lapsed, 2.6 km away
More from Kakinada Gateway Port Limited in Kakinada
- Kakinada SEZ Port Phase-1 — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.