Quick answers
What is this project?
Provision of New 20'' Hsd Pipeline From Vpt Jetty to Bpcl Visakha Installation by Replacing the Existing 14'' Ldo Pipeline Within the Existing Row is a lapsed port and coastal project in Visakhapatnam Urban, Visakhapatnam (Urban), Visakhapatnam, Andhra Pradesh. The site covers 2.9 acres.
Who is building it?
The applicant is Gautham Purandara.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Visakhapatnam Urban, Visakhapatnam (Urban), Visakhapatnam, Andhra Pradesh.
How big is it?
It has a stated cost of ₹2.1 crore and a site of 2.9 acres.
When was it filed?
The application was filed on 18 Oct 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 18 Oct 2023 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Ports & coast |
| Applicant | Gautham Purandara |
| Land area | 2.9 acres (1.2 ha) |
| Project cost | ₹2.1 crore |
| Village / locality | Visakhapatnam Urban |
| Taluk / tehsil | Visakhapatnam (Urban) |
| District | Visakhapatnam |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-05162 |
In context
29 applications in Visakhapatnam since January 2022 are in the same category (Ports & coast): 11 approved, 6 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.9 acres, this one is smaller than 86% of them.
38 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Visakhapatnam Urban, Visakhapatnam (Urban), Visakhapatnam, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- EC amendment of Visakh Refinery for inclusion of 370 TPA Green Hydrogen Plant… — environmental approval granted, 1.2 km away
- No increase in pollution load for establishment of Demo CO2 Capture Pilot… — initial checks, 1.5 km away
- Installation of 14 MLD SWRO Plant at HPCL Visakh refinery — under coastal review, 1.5 km away
- Proposed Modernization of Existing berth WQ 6 of Vishakhapatnam Port… — environmental approval granted, 2.1 km away
- Proposed Modernization of Existing berth WQ 6 of Vishakhapatnam Port… — lapsed, 2.1 km away
- Proposed Modernization of Existing Berth WQ 7 and 8 of Visakhapatnam Port,… — environmental approval granted, 2.2 km away
- Proposed Modernization of Existing Berth WQ 7 and 8 of Visakhapatnam Port,… — lapsed, 2.2 km away
- Proposed Modernization of Existing berth WQ 7 and 8 of Vishakapatnam Port,… — returned to applicant, 2.2 km away