Quick answers
What is this project?
Proposed High Rise Structure of 'residential Apartment Building Consisting of Basement + Stilt + Ground Floor +8 Floors, With 1 Block and Total Built-Up Area of 21431.45 Sq. M is a lapsed building project in Visakhapatnam Urban, Visakhapatnam (Urban), Visakhapatnam, Andhra Pradesh. The site covers 1.1 acres.
Who is building it?
The applicant is Monark Realcon Private Limited.
Has it been approved?
No. The application was lapsed on 17 Jul 2025, so it is no longer under consideration.
Where is it?
In Visakhapatnam Urban, Visakhapatnam (Urban), Visakhapatnam, Andhra Pradesh.
How big is it?
It has a stated cost of ₹75.8 crore and a site of 1.1 acres.
When was it filed?
The application was filed on 5 Jun 2025.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed High Rise Structure of 'residential Apartment Building Consisting of Basement +…
Project details
| Status | Lapsed |
|---|---|
| Status since | 17 Jul 2025 |
| Application filed | 5 Jun 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Monark Realcon Private Limited |
| Land area | 1.1 acres (0.5 ha) |
| Project cost | ₹75.8 crore |
| Village / locality | Visakhapatnam Urban |
| Taluk / tehsil | Visakhapatnam (Urban) |
| District | Visakhapatnam |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-05196 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Jun 2025 (this page) | Lapsed | 1.1 acres | ₹75.8 crore |
| New project filed 17 Dec 2024 | Environmental approval granted | 1.1 acres | ₹75.8 crore |
| New project filed 16 Dec 2024 | Withdrawn | 1.1 acres | ₹75.8 crore |
In context
89 applications in Visakhapatnam since January 2022 are in the same category (Buildings & townships): 64 approved, 11 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.1 acres, this one is smaller than 91% of them.
39 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Visakhapatnam Urban, Visakhapatnam (Urban), Visakhapatnam, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed High Rise Structure of 'residential Apartment Building Consisting of… — environmental approval granted, 0 m away
- Proposed High Rise Structure of 'residential Apartment Building Consisting of… — withdrawn, 0 m away
- Building project by M/s. Harsha Properties LLP — environmental approval granted, 50 m away
- Project by GCON Enterprise LLP — lapsed, 700 m away
- 5- star Luxury Hotel and Commercial Spaces by M/s ITC Hotels Limited — environmental approval granted, 1.4 km away
- Project by M/s. Mihika Constructions Pvt Ltd — lapsed, 2.1 km away
- Modernization and Upgradation of Visakhapatnam Fishing Harbour (VFH) — lapsed, 2.1 km away
- Modernization and Upgradation of Visakhapatnam Fishing Harbour (VFH) — cleared for impact study, 2.1 km away
All 3 Monark Realcon projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.