Project details
| Status | Lapsed |
|---|---|
| Status since | 21 Jun 2025 |
| Application filed | 17 Apr 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Tourism & hotels |
| Applicant | Macau Beach Resort |
| Land area | 1.2 acres (0.5 ha) |
| Project cost | ₹5 crore |
| Village / locality | Ipurupalem |
| Taluk / tehsil | Chirala |
| District | Bapatla |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-05221 |
In context
8 applications in Bapatla since January 2022 are in the same category (Tourism & hotels): 4 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ipurupalem, Chirala, Bapatla, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Beach Resort at sy.no. 497/2C1A, 497/3C1A, 497/2C1, 497/3C1B, 497/3C1C of… — coastal clearance granted, 1.2 km away
- Development of Beach Resort at Kothapeta Village, Vetapalem Mandal, Bapatla… — coastal clearance granted, 1.7 km away
- Construction of Proposed Beach Resort by M/s. Ares Enterprises — lapsed, 2.4 km away
- Construction of Proposed Beach Resort by M/s. Amaravati Beach Resorts — lapsed, 2.7 km away
- Beach Resort at Sy. Nos 431-1A, 431-1B, Ramapuram village, Vetapalem Mandal,… — under coastal review, 4.5 km away
- Tourism project by M/s. Bay View Resorts — violation case under review, 4.6 km away
- Construction of Proposed Beach Resort by M/s. Srinivasa Group — coastal clearance granted, 4.9 km away
- Proposed Beach Resort by M/s. Sriven Resorts Private Limited — coastal clearance granted, 5.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.