What is Mining project by M/s Sri Karthikeya MSAND LLP?
This proposed mining project by M/s Sri Karthikeya MSAND LLP is in Palicherlapadu, Venkatachalam, Nellore, Andhra Pradesh. The site covers 2.7 acres.
Who is building it?
The applicant is Sri Karthikeya Msand LLP.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Palicherlapadu, Venkatachalam, Nellore, Andhra Pradesh.
How big is it?
It has a stated cost of ₹25 lakh and a site of 2.7 acres.
When was it filed?
The application was filed on 2 Nov 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Mining project by M/s Sri Karthikeya MSand LLP
Project details
| Status | Under environmental review |
|---|---|
| Status since | 5 Nov 2026 |
| Application filed | 2 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Sri Karthikeya Msand LLP |
| Land area | 2.7 acres (1.1 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Palicherlapadu |
| Taluk / tehsil | Venkatachalam |
| District | Sri Potti Sriramulu Nellore (Nellore) |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-05266 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 2 Nov 2026 (this page) | Under environmental review | 2.7 acres | ₹25 lakh |
| Ownership transfer filed 1 Jul 2026 | Environmental approval granted | 3.9 acres | ₹30 lakh |
In context
232 applications in Nellore since January 2022 are in the same category (Mining): 150 approved, 25 filed or under review, and 57 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.7 acres, this one is smaller than 95% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 67.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.
Where it is
Palicherlapadu, Venkatachalam, Nellore, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 1.093 Ha. of Road Metal and Gravel Quarry of Sri Duvvuru Siva Kumar Reddy — environmental approval granted, 0 m away
- 1.093 Ha. of Road Metal and Gravel Quarry of Sri Duvvuru Siva Kumar Reddy — cleared for impact study, 0 m away
- Diversion of 1.13 Ha of Forest Land for Extraction of Road Metal and Building… — in-principle approval, conditions pending, 0 m away
- 1.130 Hectares of Road Metal & Building Stone Quarry of Sri D. Siva Kumar… — cleared for impact study, 150 m away
- Diversion of 3.80 Ha. (Previously 3.20 Ha.) of forest land for quarrying of… — under forest review, 250 m away
- Diverstion of 2.20 Ha. of Forest Land for Renewal of Mining Lease for… — under forest review, 250 m away
- 3.800 Ha. of Road Metal Quarry of M/s Sri Lakshmi Srinivasa Mining, Survey No.… — environmental approval granted, 300 m away
- Mining project by M/s Sri Karthikeya MSAND LLP — under environmental review, 400 m away
More from Sri Karthikeya Msand LLP in Sri Potti Sriramulu Nellore
- Mining project by M/s Sri Karthikeya MSAND LLP — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.