One of 2 filings for this project. The project's main page, with every filing and where each stands: Greenfield Integrated Steel Plant (ISP) of 8.2 MTPA by M/s. ArcelorMittal Nippon Steel…
Project details
| Official title | Establishment of Greenfield Integrated Steel Plant (ISP) of 8.2 MTPA by M/s. ArcelorMittal Nippon Steel India Limited (AM/NS India Ltd) at Butchirajupeta, Chandanada, D L Puram, Rajayyapeta and Vempadu Villages, Nakkapalli Mandal, Anakapalli District, Andhra Pradesh. |
|---|---|
| Status | Under environmental review |
| Status since | 19 Nov 2026 |
| Application filed | 7 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Arcelormittal Nippon Steel India Limited |
| Land area | 6,050.4 acres (2,448.5 ha) |
| Project cost | ₹67,345 crore |
| Village / locality | Rajayyapeta |
| Taluk / tehsil | Nakkapalle |
| District | Anakapalli |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-05282 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 7 Nov 2026 (this page) | Under environmental review | 6,050.4 acres | ₹67,345 crore |
| Early planning filed 12 Feb 2025 | Cleared for impact study | 6,050.4 acres | ₹67,345 crore |
In context
30 applications in Anakapalli since January 2022 are in the same category (Industry): 18 approved, 5 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 6,050.4 acres, this one is larger than 90% of them.
Where it is
Rajayyapeta, Nakkapalle, Anakapalli, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Integrated Steel Plant (ISP) of 8.2 MTPA by M/s. ArcelorMittal… — environmental approval granted, 0 m away
- Greenfield Integrated Steel Plant (ISP) of 8.2 MTPA by M/s. ArcelorMittal… — cleared for impact study, 0 m away
- Diversion of 0.05 Ha of Forest Land in Compartment No.968, Kesavaram… — more information requested, 17.6 km away
- 2D seismic data acquisition in Sector-3A (Krishna Godavari), under Mission… — initial checks, 20.5 km away
- Expansion of Agrochemicals, Fine Chemicals, API unit, Co-generation Power… — cleared for impact study, 20.7 km away
- Expansion of Agrochemicals, Fine Chemicals, API unit, Co-generation Power… — returned to applicant, 20.7 km away
- Amendment in Ec for Change in Boilers Configuration, Fresh Water Requirement… — environmental approval granted, 20.7 km away
- Proposed Change in Product Mix of existing Agrochemicals and Fine Chemicals,… — initial checks, 20.7 km away
More from Arcelormittal Nippon Steel India Limited in Anakapalli
- Greenfield Integrated Steel Plant (ISP) of 8.2 MTPA by M/s. ArcelorMittal… — environmental approval granted
4 Arcelormittal Nippon Steel projects in Anakapalli
All 65 Arcelormittal Nippon Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.