What is Developing? Open the mapMap

LapsedWater & irrigation · Kra Daadi, Arunachal Pradesh

Kamala Hydro Electric Project

Kamala Hydro Electric Project is a lapsed water and irrigation project in Anung, Tali Adc, Kra Daadi, Arunachal Pradesh. The site covers 9,535.5 acres. Its stated project cost is ₹21,815 crore. As of 27 Nov 2026, its status is “Lapsed” (since 4 Sept 2026).

See it on the live map All projects in Kra Daadi

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Kamala Hydro Electric Project

Project details

StatusLapsed
Status since4 Sept 2026
Application filed6 Jan 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorWater & irrigation
ApplicantNhpc Limited
Land area9,535.5 acres (3,858.9 ha)
Project cost₹21,815 crore
Village / localityAnung
Taluk / tehsilTali Adc
DistrictKra Daadi
StateArunachal Pradesh
Location fromSite boundary on record
Our referenceWID-AR-00037

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 6 Jan 2026 (this page)Lapsed9,535.5 acres₹21,815 crore
Early planning filed 8 May 2024Cleared for impact study9,535.5 acres₹21,815 crore

Where it is

Anung, Tali Adc, Kra Daadi, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 25 Nhpc projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.