What is Developing? Open the mapMap

LapsedMining · Upper Subansiri, Arunachal Pradesh

Taliha Graphite Deposit over an area 496 ha

Taliha Graphite Deposit over an area 496 ha is a lapsed mining project in Taliha H.Q., Taliha Adc, Upper Subansiri, Arunachal Pradesh. The site covers 1,225.6 acres. Its stated project cost is ₹78.8 crore. As of 27 Nov 2026, its status is “Lapsed” (since 23 Dec 2024).

See it on the live map All projects in Upper Subansiri

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleTaliha Graphite Deposit over an area 496 ha. in Village Taliha, Upper Subansiri District, Arunachal Pradesh
StatusLapsed
Status since23 Dec 2024
Application filed23 Dec 2024
Approval soughtForest land use
Application typeNew project
SectorMining
ApplicantSthenos Cement Private Limited
Land area1,225.6 acres (496 ha)
Forest land7.1 acres (2.9 ha)
Project cost₹78.8 crore
Village / localityTaliha H.Q.
Taluk / tehsilTaliha Adc
DistrictUpper Subansiri
StateArunachal Pradesh
Location fromSite boundary on record
Our referenceWID-AR-00079

In context

6 applications in Upper Subansiri since January 2022 are in the same category (Mining): 0 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected.

No other mining lease on record has applied within 5 km of this site.

Where it is

Taliha H.Q., Taliha Adc, Upper Subansiri, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Sthenos Cement Private Limited in Upper Subansiri

All 5 Sthenos Cement projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.