Quick answers
What is this project?
Diversion of 0.0041 Ha of Forest Land for Etablishment of Petrol Pump at Dobum, Banderdewa is a proposed fuel station in Upper Dobum, Naharlagun Eac, Papum Pare, Arunachal Pradesh. The site covers 0.3 acres.
Who is building it?
The applicant is Gunia Nabam.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Upper Dobum, Naharlagun Eac, Papum Pare, Arunachal Pradesh.
How big is it?
It has a stated cost of ₹70 lakh and a site of 0.3 acres.
When was it filed?
The application was filed on 11 Aug 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of 0.0041 Ha of Forest Land for Etablishment of Petrol Pump at Dobum, Banderdewa
Project details
| Official title | Proposal for Diversion of 0.0041 Ha of Forest Land for Etablishment of Petrol Pump at Dobum, Banderdewa in Papum Pare District of Arunachal Pradesh. |
|---|---|
| Status | Under wildlife review |
| Status since | 11 Aug 2025 |
| Application filed | 11 Aug 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Gunia Nabam |
| Land area | 1,400 m² |
| Project cost | ₹70 lakh |
| Village / locality | Upper Dobum |
| Taluk / tehsil | Naharlagun Eac |
| District | Papum Pare |
| State | Arunachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AR-00290 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 11 Aug 2025 (this page) | Under wildlife review | 0.3 acres | ₹70 lakh |
| New project filed 2 May 2025 | Forest land use approved | 0.3 acres | ₹70 lakh |
In context
12 applications in Papum Pare since January 2022 are in the same category (Fuel stations): 3 approved, 8 filed or under review, and 1 withdrawn, lapsed or rejected. At 0.3 acres, this one is larger than 75% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Upper Dobum, Naharlagun Eac, Papum Pare, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.0041 Ha of Forest Land for Etablishment of Petrol Pump at… — forest land use approved, 0 m away
- Diversion of 0.0945 ha of forest land for Establishment of Indian Oil… — under wildlife review, 150 m away
- Diversion of 0.0945 ha of forest land for Establishment of Indian Oil… — more information requested, 150 m away
- Establishment of Patrol Pump at Banderdewa — lapsed, 850 m away
- Establishment of Petrol Pump at Banderdewa. — forest land use approved, 850 m away
- Industrial project by M/S Satyam Steel and Alloys for Regularization of the… — cleared for impact study, 2.1 km away
- Diversion of 1.65 Ha of Forest Land for Construction of Toll Plaza Ot NH-415… — initial checks, 2.5 km away
- Diversion of 1.65 Ha of Forest Land for Construction of Toll Plaza Ot NH-415… — lapsed, 2.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.