Quick answers
What is this project?
This approved mining project by M/S Tata Brick Industry Mpa for Brick Earth is in Baghjan Grant, Amguri, Sivasagar, Assam. The site covers 1.6 acres.
Who is building it?
The applicant is Pranjit Bhuyan.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 10 Oct 2022), as of 27 Nov 2026.
Where is it?
In Baghjan Grant, Amguri, Sivasagar, Assam.
How big is it?
It has a stated cost of ₹15 lakh and a site of 1.6 acres.
When was it filed?
The application was filed on 10 Oct 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Oct 2022 |
| Application filed | 10 Oct 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pranjit Bhuyan |
| Land area | 1.6 acres (0.6 ha) |
| Project cost | ₹15 lakh |
| Village / locality | Baghjan Grant |
| Taluk / tehsil | Amguri |
| District | Sivasagar |
| State | Assam |
| Location from | Taluk / tehsil |
| Our reference | WID-AS-00029 |
In context
74 applications in Sivasagar since January 2022 are in the same category (Mining): 38 approved, 9 filed or under review, and 27 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.6 acres, this one is smaller than 56% of them.
Where it is
Baghjan Grant, Amguri, Sivasagar, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jhanji River Sand Mpa "e" (Sandghat-A) — environmental approval granted, 5.5 km away
- Jhanji River Sand Mining Permit Area E (Sandghat A) — environmental approval granted, 5.5 km away
- Jhanji Tengabari Dulia Sand Mining Concession Area — lapsed, 6.7 km away
- "Baghjan Grant Brick Earth Mining Permit Area (M/S Tata Brick Industry)" — lapsed, 7.3 km away
- Jhanji River Tengabari Dulia MCA No. 1 for Sand — under environmental review, 7.5 km away
- Proposed Onshore Oil and Gas Development and Production with Exploration… — cleared for impact study, 7.6 km away
- Workover Activities and Testing of Hydrocarbons in Well No.- A-5, A-14, A-10B,… — not approved, 7.6 km away
- Proposed Onshore Oil and Gas Development and Production with Exploration… — withdrawn, 7.8 km away
More from Pranjit Bhuyan in Sivasagar
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.