Quick answers
What is this project?
Proposed River bed mining project of Longai Sand Minor Mineral Unit No 1A & B on Longai river bed, located at Tinokhal-Saigoi area is a proposed mining project in Achair Ghat, Nilambazar, Karimganj, Assam. The site covers 29.7 acres.
Who is building it?
The applicant is Biraj Das.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 10 Nov 2022), as of 27 Nov 2026.
Where is it?
In Achair Ghat, Nilambazar, Karimganj, Assam.
How big is it?
It has a stated cost of ₹5.7 crore and a site of 29.7 acres.
When was it filed?
The application was filed on 10 Nov 2022.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed River bed mining project of Longai Sand Minor Mineral Unit No 1A & B on Longai…
Project details
| Official title | Proposed River bed mining project of Longai Sand Minor Mineral Unit No 1A & B on Longai river bed, located at Tinokhal-Saigoi area, in Karimganj district of Assam under Duhalia Range of Karimganj Forest Division, Karimganj , Assam. |
|---|---|
| Status | Cleared for impact study |
| Status since | 10 Nov 2022 |
| Application filed | 10 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Biraj Das |
| Land area | 29.7 acres (12 ha) |
| Project cost | ₹5.7 crore |
| Village / locality | Achair Ghat |
| Taluk / tehsil | Nilambazar |
| District | Karimganj |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-00040 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 28 Mar 2024 | Environmental approval granted | 29.7 acres | ₹5.7 crore |
| Early planning filed 10 Nov 2022 (this page) | Cleared for impact study | 29.7 acres | ₹5.7 crore |
In context
35 applications in Karimganj since January 2022 are in the same category (Mining): 22 approved, 5 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 29.7 acres, this one is larger than 94% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Achair Ghat, Nilambazar, Karimganj, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed River bed mining project of Longai Sand Minor Mineral Unit No 1A & B… — environmental approval granted, 300 m away
- Patta Land Ordinary Earth Mining Permit Area at Dengarbond Mouza — environmental approval granted, 2.1 km away
- Patta Land Ordinary Earth Mining Permit Area at Pecharghat Mouza — environmental approval granted, 3.2 km away
- Four Laning of Chandkhira – Churaibari section of NH-8 from Design chainage… — forest land use approved, 4.2 km away
- Longai Sand Minor Mineral Unit No 5 — environmental approval granted, 5.1 km away
- 20 Nos. Ghat Longai Sand Minor Mineral Unit — initial checks, 6 km away
- Govt. Khas Land Earth Mining Permit Area at Dakhin Hatikhira Mouza — environmental approval granted, 6.3 km away
- Longai Sand Minor Mineral Unit No. 1 (C) near Baithakhal area, Village:… — environmental approval granted, 6.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.