What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Kamrup Metropolitan, Assam

Commercial Building Project at G.S. Road, Near Six Mile Flyover, Guwahati-781021, Dist Kamrup (M), Assam by M/s Greentech Projects (Total Plot Area: 5,801 & Total Built-Up Area: 22,100)

Commercial Building Project at G.S. Road, Near Six Mile Flyover, Guwahati-781021, Dist Kamrup (M), Assam by M/s Greentech Projects (Total Plot Area: 5,801 & Total Built-Up Area: 22,100) is an approved building project in Duar Andha, Dispur, Kamrup Metropolitan, Assam. The site covers 1.4 acres. Its stated project cost is ₹48.6 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 6 Nov 2023).

See it on the live map All projects in Kamrup Metropolitan

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since6 Nov 2023
Application filed6 Nov 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantGreentech Projects
Land area1.4 acres (0.6 ha)
Project cost₹48.6 crore
Village / localityDuar Andha
Taluk / tehsilDispur
DistrictKamrup Metropolitan
StateAssam
Location fromSite boundary on record
Our referenceWID-AS-00234

In context

102 applications in Kamrup Metropolitan since January 2022 are in the same category (Buildings & townships): 75 approved, 17 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.4 acres, this one is smaller than 90% of them.

49 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Duar Andha, Dispur, Kamrup Metropolitan, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Greentech Projects in Kamrup Metropolitan

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.