Quick answers
What is Sand Gravel, Gravel & Sand Aie River Mahal at Dologaon?
Sand Gravel, Gravel & Sand Aie River Mahal at Dologaon is an approved mining project in Kolobari Kashibari, Bengtol, Chirang, Assam. The site covers 4.9 acres.
Who is building it?
The applicant is Mwikhwm Owary.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 24 Apr 2024), as of 27 Nov 2026.
Where is it?
In Kolobari Kashibari, Bengtol, Chirang, Assam.
How big is it?
It has a stated cost of ₹53 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 12 Feb 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 24 Apr 2024 |
| Application filed | 12 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Mwikhwm Owary |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹53 lakh |
| Village / locality | Kolobari Kashibari |
| Taluk / tehsil | Bengtol |
| District | Chirang |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-00394 |
In context
35 applications in Chirang since January 2022 are in the same category (Mining): 11 approved, 3 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.9 acres, this one is smaller than 86% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Kolobari Kashibari, Bengtol, Chirang, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Nangalbhanga Manikpur Stone, Sand Gravel, Sand & Chips Aggregate Mahal — environmental approval granted, 850 m away
- Aie Ghat Sand Gravel River Mahal — lapsed, 1.1 km away
- Palangsuguri Sand, Gravel, Boulder & Earth Mining Permit Area — lapsed, 1.3 km away
- Kanamakra River Sand/Gravel (Chikapara 1 & 2) MCA — lapsed, 3 km away
- Kanamakra Sand/Gravel River Mahal No.2 at Kanamakra River Bed — lapsed, 4 km away
- Kanamakra River Sand Gravel Mahal at Kanamakra(Lakhipur to Bhabanipur Muslim… — under environmental review, 5.3 km away
- Facilities for Use of Natural Gas at Bongaigaon Refinery — initial checks, 5.6 km away
- Chotto Nilibari Village Patta Land Sandgravel, Clay & Stone Mining Permit Area — lapsed, 6.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.