Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 18 Jun 2023 |
| Application filed | 18 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sibsagar Territorial Forest Division |
| Land area | 8.4 acres (3.4 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Panichoki Grant |
| Taluk / tehsil | Sonari |
| District | Charaideo |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-00496 |
In context
25 applications in Charaideo since January 2022 are in the same category (Mining): 12 approved, 2 filed or under review, and 11 withdrawn, lapsed or rejected. At 8.4 acres, this one is larger than 76% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Panichoki Grant, Sonari, Charaideo, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Dilli River Stone Mining Permit Area, A (VB) — environmental approval granted, 550 m away
- "Hiloni Naga Gaon P.P. Land STONE MINING PERMIT AERA" — lapsed, 1.2 km away
- Desang River Sand Mining Permit Area H (Sapekhati) — environmental approval granted, 19.4 km away
- Desang River Bhojo Shashanghat MPA for SAND — environmental approval granted, 33.9 km away
- Desang River Sand Mining Permit Area I (Bhojo) — environmental approval granted, 33.9 km away
- 3D Seismic survey (Solah RF, Abhoipur RF, Sapekhati RF, and Diroi RF) under… — initial checks, 36.3 km away
- Pcb — lapsed, 36.8 km away
- Development Drilling of 11 Wells and Testing of Hydrocarbons in Two Fields… — environmental approval granted, 36.8 km away
More from Sibsagar Territorial Forest Division in Charaideo
- Desang River Sand Mining Permit Area H (Sapekhati) — environmental approval granted
- Desang River Sand Mining Permit Area I (Bhojo) — environmental approval granted
- Dilli River Stone Mining Permit Area, A (VB) — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.