Quick answers
What is this project?
Proposed Expansion of Formaldehyde Plant from 100TPD To 125TPD, Captive Power Plant from 5MW To 11MW within the Existing Complex (Under Violation) is a proposed industrial project in Kachari Pathar, Naharkatiya, Dibrugarh, Assam. The site covers 108 acres.
Who is building it?
The applicant is Assam Petrochemicals Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Kachari Pathar, Naharkatiya, Dibrugarh, Assam.
How big is it?
It has a stated cost of ₹1,772.1 crore and a site of 108 acres.
When was it filed?
The application was filed on 5 Mar 2025.
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 15 Apr 2025 |
| Application filed | 5 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Assam Petrochemicals Limited |
| Land area | 108 acres (43.7 ha) |
| Project cost | ₹1,772.1 crore |
| Village / locality | Kachari Pathar |
| Taluk / tehsil | Naharkatiya |
| District | Dibrugarh |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-00593 |
In context
5 applications in Dibrugarh since January 2022 are in the same category (Industry): 2 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kachari Pathar, Naharkatiya, Dibrugarh, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Setting-up new 2200 MTPD Ammonia and 3850 MTPD Urea fertilizer project at… — under environmental review, 2 km away
- Setting-up new 2200 MTPD Ammonia and 3850 MTPD Urea fertilizer project at… — under wildlife review, 2 km away
- Eia/Emp/Ra Study for Proposed New Brownfield 2200 Mtpd Ammonia and 3850 Mtpd… — application filed, 2 km away
- Setting-up new 2200 MTPD Ammonia and 3850 MTPD Urea fertilizer project at… — cleared for impact study, 2 km away
- Chaikya Gaon Pp Land Stone Mining Permit Area — lapsed, 2.1 km away
- "DBR/04/Dilli River/Stone MCA" — environmental approval granted, 2.6 km away
- "DBR/02/Dilli River/Stone MCA" — withdrawn, 3.2 km away
- "DBR/01/Dillighat/Dilli River/Stone MCA" — environmental approval granted, 3.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.