What is Developing? Open the mapMap

LapsedIndustry · Kamrup, Assam

Regularisation of Existing Manufacturing Unit- Dhubri Plywood Factory(Div. B R Chatterjee & Co PVT LTD) That Produces Resin of 450 Mtpa and Timber Based Products of 150,000 Square Meter Per Annum.

Regularisation of Existing Manufacturing Unit- Dhubri Plywood Factory(Div. B R Chatterjee & Co PVT LTD) That Produces Resin of 450 Mtpa and Timber Based Products of 150,000 Square Meter Per Annum is a lapsed industrial project in Kakjhar, Palasbari, Kamrup, Assam. The site covers 1.3 acres. Its stated project cost is ₹3 crore. As of 27 Nov 2026, its status is “Lapsed” (since 29 Oct 2024).

See it on the live map All projects in Kamrup

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Regularisation of Existing Manufacturing Unit- Dhubri Plywood Factory(Div. B R Chatterjee & Co PVT LTD) That Produces Resin of 450 Mtpa and Timber Based Products of 150,000 Square Meter Per Annum is a lapsed industrial project in Kakjhar, Palasbari, Kamrup, Assam. The site covers 1.3 acres.

Who is building it?

The applicant is B R Chatterjee & Co Private LTD.

Has it been approved?

No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.

Where is it?

In Kakjhar, Palasbari, Kamrup, Assam.

How big is it?

It has a stated cost of ₹3 crore and a site of 1.3 acres.

When was it filed?

The application was filed on 2 Feb 2024.

Project details

StatusLapsed
Status since29 Oct 2024
Application filed2 Feb 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantB R Chatterjee & Co Private LTD
Land area1.3 acres (0.5 ha)
Project cost₹3 crore
Village / localityKakjhar
Taluk / tehsilPalasbari
DistrictKamrup
StateAssam
Location fromSite area on record
Our referenceWID-AS-00624

In context

17 applications in Kamrup since January 2022 are in the same category (Industry): 13 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.3 acres, this one is smaller than 88% of them.

10 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kakjhar, Palasbari, Kamrup, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from B R Chatterjee & Co Private LTD in Kamrup

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.